太原某电厂基坑降水方案优化及其应用
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
基坑降水过程中由于多采用经验渗透系数,降水井布置不合理,直接影响基础及上部结构的施工。本文以太原市某电厂基坑降水为实例,通过抽水试验确定渗透系数,采用大口井方法确定基坑涌水量和基坑影响半径,制定合理的基坑降水及基坑支护和回灌技术方案,并推广该技术方案在在电力行业中的应用。
Dewatering well set unreasonable because of using the experience hydraulic conductivity in the process of the dewatering,which has a direct effect on the construction of the foundation and superstructure.This paper takes the case of dewatering of a power plant in Taiyuan,obtain the hydraulic conductivity by pumping test,use large opening well method to ascertain the water inflow and radius of influence of the foundation pit,formulate reasonable plans for dewatering and recharge,and promote this plans in the application of the power industry.
引文
[1]关多会.太原第二热电厂技改工程岩土工程勘测报告[R].山西省电力勘测设计院,1999.
    [2]张永波,孙效忠.基坑降水工程[M].北京:地震出版社,2000.
    [3]《工程地质手册》编委会.工程地质手册(第四版)[M].北京:中国建筑工业出版社,2007.
    [4]中华人民共和国国家发展和改革委员会.DL/T5034—2006电力工程水文地质勘测技术规程[S].北京:中国电力出版社,2006.
    [5]中华人民共和国建设部.JGJ120—99建筑基坑支护技术规程[S].北京:中国建筑工业出版社,1999.
    [6]中华人民共和国建设部.GB50027—2001供水水文地质勘察规范[S].北京:中国计划出版社,2001.