“5.12”汶川地震堰塞湖应急处置工程除险实践
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
本文总结了"5.12"汶川地震堰塞湖应急工程除险经验,介绍了堰塞湖应急除险的特点、原则、初期快速评估风险的方法,并综合有代表性的堰塞湖工程除险方案介绍了典型处置方法,以便为以后同类工程提供相关经验。
The experiences from the constructions of the emergency risk-eliminations of landslide dams formed during "5.12" Earthquake are summarized herein;in which not only the characteristics,principles,method for the early-stage quick risk assessment are introduced,but some typical construction methods are also presented based on the representative schemes for the risk-eliminations,so as to provide some relevant experiences for the similar project concerned in the days to come.
引文
[1]孙丹丹,等.堰塞湖风险等级判定模型及其参数敏感分析[J].中国农村水利水电,2010(12).
    [2]严祖文,等.堰塞坝形成机理及稳定性分析[J].中国地质灾害与防治学报,2009,19(4).

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心