我国地下水电站建设的发展
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
建国初期,我国在经济技术水平十分薄弱的基础上开始了地下水电站建设。1980年后,引进了先进技术,设计理论突破,施工技术更新,又好又快地建成了一批高水平的地下水电站,积累了丰富的经验,地下水电站建设取得了巨大的成就。实践表明,地下水电站具有多方面的优越性,有着广阔的发展前景。
In the early years of new China,the construction of underground hydropower stations is begin even if the economy and technology is very weak at that time.Since 1980,a number of underground hydropower stations in China were soundly and fast built,rich experiences were accumulated and great achievements were made with the introduction of advanced technology,the breakthrough of design theory and the update of construction technology.Practices show that the underground hydropower stations have many advantages,and have broad prospects for development.
引文
[1]翁义孟.我国地下水电站厂房设计中的几个问题[J].水利水电技术,1979(9):10-17.
    [2]郭子嵩.地下厂房在峡谷高坝水电站枢纽布置中的优势[J].水力发电,2000,26(9):38-42.
    [3]王斌,等.汶川地震灾区水电工程震损调查及分析概述[J].水力发电,2009,35(3):1-5.
    [4]江权,等.高地应力条件下大型地下洞室群稳定性综合研究[J].岩石力学与工程学报,2008,27(9):3768-3777.
    [5]苏国韶,等.高地应力下大型地下洞室群开挖顺序与支护参数组合优化的智能方法[J].岩石力学与工程学报,2007,26(7):2800-2808.
    [6]马洪琪.我国水电站地下工程施工技术的回顾与展望[J].水力发电,2006,32(2):52-55.
    [7]白帆,等.拉西瓦水电站地下厂房开挖分层及顶拱开挖支护[J].水力发电,2007,33(11):77-79.
    [8]李勇泉,等.三峡右岸地下电站施工期安全研究[J].水力发电,2009,35(12):48-49.
    [9]张继勋,等.地下工程稳定性分析方法现状与不足[J].现代隧道技术,2005,42(2):1-4.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心