结合秦山核电二期扩建工程,在已运行核电站附近新扩建核电站的大型基坑开挖过程中进行爆破振动的监测与爆破振动的控制。通过理论分析与监测等多种手段对爆破振动进行有效的控制,确保了正在运行核电站的安全。所总结的减震措施经验对其他核电站的爆破振动控制具有借鉴作用。
According to the Qinshan nuclear power plant 2nd phase extension engineering,the monitoring and control on blasting vibration were made in the large foundation pit excavation of new expansion nuclear power plant near the operated one.The effective control on blasting vibration was realized by theoretical analysis and monitoring,and the security of the operating nuclear power plant was ensured.The vibration absorption measures summarized in this paper could be reference to blasting vibration control of other nuclear power plant.
引文
[1]GB 6722-2007,爆破安全规程[S].
    [2]张雪亮.爆破地震效应[M].北京:地震出版社,1981.
    [3]郭进平,等.新编爆破工程使用技术大全[M].北京:光明日报出版社,2002.
    [4]熊代余,顾毅成.岩石爆破理论与技术新进展[M].北京:冶金工业出版社,2002.
    [5]王文龙.钻眼爆破[M].北京:煤炭工业出版社,1984.
    [6]陈作彬.田湾核电站5号、6号机组负挖爆破设计与质量控制[J].探矿工程(岩土钻掘工程),2010,37(2):74-78.
    [7]陈作彬.田湾核电站扩建山体爆破工程爆破质量安全控制[J].探矿工程(岩土钻掘工程),2009,36(3):76-78.