龙首二级水电站厂房基础抗震设计及工程措施
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
针对黑河龙首二级水电站发电厂房基础为活断层且断层破碎带宽度较大、又地处强震区等问题,根据现行规范要求,采用ANSYS构建了厂房基础的三维有限元静动力模型,获得了厂房基础各工况的抗震计算结果,论证了厂房基础的抗震稳定性,并基于计算分析结果提出了相应的工程措施以确保厂房的安全运行。
The powerhouse foundation of Longshou Ⅱ hydropower station in Heihe River has characteristics of active fault with large width of fracture zone and is in strong seismic region.According to the existing design specification,ANSYS is used to establish three-dimensional finite elements static and dynamic model of powerhouse foundation.Then the aseismic calculation results of powerhouse foundation are obtained under different conditions.At the same time,it demonstrates aseismic stability of the powerhouse foundation.Finally,the corresponding engineering measures are put forward to guarantee safety operation of powerhouse.
引文
[1]柳发桐.黑河龙首二级(西流水)水电站厂房工程地质勘测报告[R].兰州:甘肃省水利水电勘测设计研究院,2002.
    [2]杨斌,周俊喜.黑河龙首二级水电站电站短石梯河坝—黑沟断层活动性评价报告[R].兰州:兰州地震研究所,2002.
    [3]中国水利水电科学研究院,电力工业部昆明勘测设计研究院,电力工业部西北勘测设计研究院,等.水工建筑物抗震设计规范(SL203-97)[S].北京:中国水利水电出版社,1997.
    [4]周俊喜.地震安全性评价报告[R].兰州:兰州地震研究所,2003.
    [5]周晶,陈健云.黑河龙首二级水电站工程厂房基础非线性动力有限元分析[R].大连:大连理工大学土木水利学院工程抗震研究所,2003.
    [6]武维新.龙首二级(西流水)水电站发电厂房基础设计专题报告[R].兰州:甘肃省水利水电勘测设计研究院,2002.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心