核电站核岛基础爆破开挖减震控制
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
核电站基础爆破开挖时,必须控制爆破振动效应,确保预留基岩及附近建筑物和构筑物的安全。以一在建核电站基础爆破施工及振动控制为基础,介绍了爆破振动监测过程和减振方法。现场爆破实验结果表明,采用布设减振孔的方法可以减小爆破振动效应。振动效应随减振孔孔径增大而减小,随孔距增大而增大,并且孔距对减振效果的影响要大于孔径的影响,施工中应优先选择减小减振孔孔距的方法。
In foundation excavation of a nuclear power plant,the blasting vibration should be controlled strictly in order to ensure the safety of bedrock and nearby buildings and structures.The authors presented the whole process of vibration monitoring and vibration reduction method based on the foundation excavation of the nuclear island.The in situ blasting tests reveal that shock absorption holes can reduce the blasting vibration.The vibration velocities of rock particles increase with hole spacing,and decrease with hole diameter.It is more efficient in practice to reduce blasting vibration by reducing shock absorption hole spacing than by extending hole diameter.
引文
[1]齐宝军,王有成,李宝辉,王金海,等.水厂铁矿边坡缓冲孔爆破工艺及其震动效应[J].矿冶工程,2000,20(2)
    [2]吴从师,齐宝军,刘宇峰.边坡分段装药炮孔的压力变化与爆破效果[J].辽宁工程技术大学学报(自然科学版),2001,20(4)
    [3]任国龙.三门核电循环水泵房基坑开挖对支护体系的爆破振动控制[J].工程爆破,2010,16(1)
    [4]姚文生,韩文红,邹德麟.秦山核电站深孔爆破振动安全控制[J].工程爆破,2005,11(1)
    [5]徐荣华,金晓忠.爆破施工中古危塔安全保护技术初探[J].西部探矿工程,2002,14(5)
    [6]赵孟岐.隧道爆破施工减振措施分析[J].山西建筑,2011,37(7)
    [7]杨勇.浅析爆破地震波的控制方法[J].建筑知识(学术刊),2011,(8)
    [8]何广沂.工程爆破新技术[M].北京:中国铁道出版社,2000
    [9]中华人民共和国国家标准.爆破安全规程(GB6722-2003)[S].中华人民共和国国家质量监督检验检疫总局,2003