引文
[1]WAKABAYASHI M,NAKAMURA T,KASHIBARA A,etal.Experimental study of elasto-plastic properties of pre-cast concrete wall panels with built-in insulating braces[J].Summaries of Technical Papers of Annual Meeting,Architectural Institute of Japan,1973:104121044:12-20.
[2]CLARK P,AIKEN I,KASAI K,et al.Design proceduresfor buildings incorporating hysteretic damping devices[C]Proceedings,69th Annual Convention,SEAOC,Sac-ramento,CA:1999.
[3]Gary S Prinz,P E,M ASCE,et al.Seismic performanceof buckling-restrained braced frames with eccentric con-figurations[J].Journal of Structural Engineering.8,2011.10.1061(ASCE)ST.1943-541X.0000471:56-
[4]FRANCESCO GENNA,PIERO GELFI.Analysis of thelateral thrust in bolted steel buckling-restrained braces[J].Journal of Structural Engineering.2,2012.10.1061(ASCE)ST.1943-541X.0000564:113-125.
[5]李国强,胡宝琳.屈曲约束支撑滞回曲线模型和刚度方程的建立[J].地震工程与工程振动,2007,27(2):26-31.
[6]高向宇,张慧,杜海燕,等.防屈曲支撑恢复力的特点及计算模型研究[J].工程力学,2011,28(6):19-28.
[7]贾明明,吕大刚,张素梅,等.防屈曲支撑钢框架基于延性的抗震性能设计[J].工程力学,2010,27(增刊):201-206.
[8]高向宇,张腾龙,黄海涛,等.用防屈曲支撑改进钢框架-支撑结构抗震性能的设计方法[J].北京工业大学学报,2010,36(9):1206-1214.
[9]胡宝琳,姚文娟,李国强.罕遇地震荷载作用下屈曲约束支撑框架结构弹塑性位移的简化计算方法[J].振动与冲击,2011,30(2):144-148.
[10]罗开海.屈曲约束支撑体系设计方法[J].建筑结构,2011,41(11):98-102
[11]李国强,郭小康.基于极限承载力平面屈曲约束支撑钢框架整体可靠度设计[J].建筑结构,2011,41,(8):68-71.
[12]李国强,郭小康.基于可靠度理论的屈曲约束支撑节点连接设计原则[J].建筑结构2010,40(3);65-67.
[13]汪家铭,中岛正爱.屈曲约束支撑体系的应用与研究进展(Ⅱ)[J].建筑钢结构进展,2005,7(2):1-11.
[14]王秀丽,陈明.一种适用于杆系结构的屈曲约束支撑的有限元分析[J].兰州理工大学学报,2007,33(3):124-127.
[15]罗开海,孔祥雄,程绍革.一种新型屈曲约束支撑的研制与试验研究[J].建筑结构,2010,40(10):1-6.
[16]张纪刚,欧进萍.新型Pall-BRB摩擦阻尼支撑体系设计方法[J].大连理工大学学报,2011,51(4):587-592.
[17]李国强,胡宝琳,孙飞飞,等.国产TJI型屈曲约束支撑的研制与试验[J].同济大学学报,2011,39(5):631-636.
[18]李国强,宫海,张杨,等.TJ型屈曲约束支撑在加固工程中关键技术研究[J]建筑结构,2010,40:135-138.