一种新型预应力空间结构——劲性支撑穹顶
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
基于索穹顶结构的技术难点以及高强钢拉杆性能特点,介绍了劲性支撑穹顶结构的构造.劲性支撑穹顶结构是由上部的预应力空间索网与下部的刚性支撑杆系组成的一种新型预应力空间结构.通过对不同跨度下索穹顶结构的拉索截面和劲性支撑穹顶结构刚性杆截面以及劲性支撑穹顶结构内部拉索与刚性杆截面对比分析,确定了劲性支撑穹顶结构的拓扑形式,验证了劲性支撑穹顶结构的合理性,并探讨了劲性支撑穹顶结构的发展前景与面临的主要技术问题.
On the analysis of the technical difficulties of cable domes and the latest research progress at high-strength rigid rod,rigid bracing dome was introduced in the paper.Rigid bracing dome is a new type of prestressed space structure.The upper part of structure is composed by prestressed cable net and the lower part is composed by rigid support system.Two sets of data were compared and analyzed.One is the rod cross-sectional areas of rigid bracing dome and the cable cross-sectional areas of cable dome in different span.The other is the cable cross-sectional areas and the rigid rod cross-sectional areas of rigid bracing dome.On the basis of the above analysis,the topology of rigid bracing dome was proposed,and the rationality of rigid bracing dome was testified.Finally,prospect and some major technical problems of rigid bracing dome were studied.
引文
[1]GEIGER D H.The design and construction of two cabledomes for the Korean Olympics[C]∥Proceeding ofIASS-ASCE Osaka,1986:265-272.
    [2]GEIGER D H,CAMPBELL D,CHEN D,et al.Designdetails of an elliptical cable dome and a large span cabledome under construction in the United States[C]∥Pro-ceedings of the 1st Oleg Kerensky Memorial Conference,1988:14-17.
    [3]LEVY M P.The Georgia dome and beyond achievinglight weight-long span structures[C]∥Proceedings ofIASS-ASCE International Symposium Atlanta,1994:560-562.
    [4]尹思明,陆赐麟.索穹顶结构体系发展的回顾与展望(上)[J].工业建筑,2003,33(6):59-61.YIN Si-ming,LU Ci-lin.Review and outlook of devel-opment of cable dome system[J].Industrial Construc-tion,2003,33(6):59-61.
    [5]史秋侠,朱智峰,裴敬.无锡太和国际高科技园区科技交流中心钢屋盖索穹顶结构设计[J].建筑结构,2009,39(S):144-148.SHI Qiu-xia,ZHU Zhi-feng,PEI Jing.Cable dome de-sign in the steel structure of international high-tech gar-den in Taihu lake in Wuxi city[J].Building Structure,2009,39(S):144-148.
    [6]洪国松,黄利顺,孙锋,等.伊金霍洛旗体育中心大型索穹顶施工技术[J].建筑技术,2011,42(11):1012-1014.HONG Guo-song,HUANG Li-shun,SUN Feng,et al.Construction technique for large cable dome of Ejin Ho-RO Banner sports center[J].Architecture Technology,2011,42(11):1012-1014.
    [7]薛素铎,刘伟.劲性支撑穹顶结构[P].中国:201010199154,2010-10-20.
    [8]董石麟,罗尧治,赵阳.大跨度空间结构的工程实践与学科发展[J].空间结构,2005,11(4):3-10.DONG Shi-lin,LUO Yao-zhi.ZHAO Yang.Practicalapplication and research advances of long-span structures[J].Spatial Structures,2005,11(4):3-10.
    [9]钱若军.张拉结构形状判定述评[J].河海大学科技情报,1990,10(3):44-58.QIAN Ruo-jun.Review of the shape of tensioned struc-ture determination[J].Hohai University Science andTechnology Information,1990,10(3):44-58.
    [10]邓华,李本悦,姜群峰.关于索杆张力结构形态问题的认识和讨论[J].空间结构,2003,9(4):39-46.DENG Hua,LI Ben-yue,JIANG Qun-feng.Comprehension and discussion on the form of cable-strut tensile structures[J].Spatial Structures,2003,9(4):39-46.
    [11]林寿,杨嗣信.钢结构工程[M].北京:中国建筑工业出版社,2009.
    [12]袁行飞,董石麟.索穹顶结构施工控制反分析[J].建筑结构学报,2001,22(2):75-80.YUAN Xing-fei,DONG Shi-lin.Inverse analysis ofconstruction process of cable dome[J].Journal ofBuilding Structures,2001,22(2):75-80.
    [13]罗尧治,沈雁彬.索穹顶结构初始状态确定与成形过程分析[J].浙江大学学报(自然科学版),2004,38(19):1321-1327.LUO Yao-zhi,SHEN Yan-bin.Initial configurationdetermination of cable dome structure and analysis ofit’s configuration process[J].Journal of Zhejiang Uni-versity(Engineering Science),2004,38(19):1321-1327.
    [14]沈祖炎,张立新.基于非线性有限元的索穹顶施工模拟分析[J].计算力学学报,2002,19(4):466-471.SHEN Zu-yan,ZHANG Li-xin.Simulation of erectionprocedures of cable domes based on nonlinear FEM[J].Chinese Journal of Computational Mechanics,2002,19(4):466-471.
    [15]黄呈伟,陶燕,罗小青,等.索穹顶的施工张拉及其模拟计算[J].昆明理工大学学报,2000,25(1):15-18.HUANG Cheng-wei,TAO Yan,LUO Xiao-qing,etal.Simulation of construction process for cable dome[J].Journal of Kunming University of Science andTechnology,2000,25(1):15-18.
    [16]陈联盟,董石麟,袁行飞.索穹顶结构施工成形理论分析和试验研究[J].土木工程学报,2006,39(11):33-36.CHEN Lian-meng,DONG Shi-lin,YUAN Xing-fei.Theoretical and experimental study on the constructionof cable domes[J].China Civil Engineering Journal,2006,39(11):33-36.
    [17]张建华,张毅刚.索穹顶结构施工全过程分析[J].武汉理工大学学报,2008,30(4):91-94.ZHANG Jian-hua,ZHANG Yi-gang.Constructionprocess analysis of cable dome[J].Journal of WuhanUniversity of Technology,2008,30(4):91-94.
    [18]唐建民,沈祖炎.圆形平面轴对称索穹顶结构的施工过程跟踪计算[J].土木工程学报,1998,31(5):24-32.TANG Jian-min,SHEN Zu-yan.The research of com-putation method of construction process simulation foraxial symmetric cable domes with circular plane[J].China Civil Engineering Journal,1998,31(5):24-32.
    [19]董石麟,袁行飞,赵宝军,等.索穹顶结构多种预应力张拉施工方法的全过程分析[J].空间结构,2007,13(1):3-14.DONG Shi-lin,YUAN Xing-fei,ZHAO Bao-jun,etal.Construction analysis of cable dome structures pre-tensioned by different schemes[J].Spatial Structures,2007,13(1):3-14.
    [20]蔡丽,钱宏亮.倾斜撑杆式索穹顶结构节点及张拉模拟[J].低温建筑技术,2007,(6):50-52.CAI Li,QIAN Hong-liang.Design of joints and simu-lation of tension of inclined strut system of suspendeddome[J].Low Temperature Architecture Technology,2007,(6):50-52.
    [21]卓新,王苗夫,董石麟.逐层双环肋环型索穹顶结构与施工成形方法[P].中国:200910153530,2009-9-30.
    [22]张博琨,刘晚成.自平衡预应力网壳-索穹顶组合结构的设计与分析[J].沈阳建筑大学学报(自然科学版),2010,26(3):452-457.ZHANG Bo-kun,LIU Wan-cheng.Design and analysisof hybridized structure composed of self-balance pres-tressed latticed shell and cable dome[J].Journal of She-nyang Jianzhu University(Natural Science),2010,26(3):452-457.
    [23]吕晶,徐国彬,王月栋.劲柔索张拉穹顶抗火反应非线性有限元分析[J].中国安全科学学报,2003,13(12):63-67.LV Jing,XU Guo-bin,WANG Yue-dong.Nonlinearfinite element analysis of tension-compression cabledome against fire[J].China Safety Science Journal,2003,13(12):63-67.
    [24]祁海珅.工程用高强度钢拉杆的研制与应用[J].工业建筑,2005,35(S1):359-361.QI Hai-shen.The manufacture and application of highstrength steel tie rod for engineering[J].IndustrialConstruction,2005,35(S1):359-361.
    [25]杨建国,叶建国,祁海珅,等.高强度建筑钢拉杆的应用与研究[J].钢结构,2005,20(5):26-28.YANG Jiang-guo,YE Jian-guo,QI Hai-shen,et al.Technical application and investigation of the highstrength constructional steel tie rod[J].Steel Con-struction,2005,20(5):26-28.
    [26]郭正兴,罗斌.大跨空间钢结构预应力施工技术研究与应用[J].施工技术,2011,40(13):101-108.GUO Zheng-xing,LUO Bin.Research and applicationof long-span space steel structure prestress construc-tion technology[J].Construction Technology,2011,40(13):101-108.
    [27]周岱.斜拉网格结构的非线性静力、动力和地震响应分析[D].杭州:浙江大学,1997.ZHOU Dai.Analysis of the Nonlinear Static Force,Dynamic and Seismic Response of the Cable-stayedSpatial Latticed Structures[D].Hangzhou:Zhejiang U-niversity,1997.
    [28]PELLEGRINO S,CALLADINE C R.Matrix analysisof statically and kinematically indeterminate frame-works[J].International Journal of Solids and Struc-tures,1986,22(4):409-428.
    [29]PELLEGRINO S.Analysis of prestressed mechanisms[J].International Journal of Solids and Structures,1990,26(12):1329-1350.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心