实时混合试验方法研究与应用综述
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
抗震试验方法的探讨一直是结构抗震研究的关键。混合试验是研究结构抗震性能的新兴的试验方法。相对其他抗震试验方法和数值模拟方法,混合试验综合两种方法的优势,目前已得到相当关注。本文总结归纳了当前混合抗震试验的研究应用现状,对混合试验原理、积分方式、保证精度的主要因素等方面进行了归纳和讨论。通过归纳整理,指出了混合试验的的特点和应用关键。
Real-time hybrid simulation is a viable experiment technique to evaluate the performance of structural systems subjected to earthquake loads.It combines the advantage of structure experiment and numerical analysis,and becomes the hot topic in the field.This paper aimed to explain the theory of real-time hybrid simulation,emphasized on the analysis of integration algorithm,actuator time-delay and compensation,introduced the current advancement.Some characteristics of hybrid test and advises have been put forward by literature analysis.
引文
[1]Darby A P,Williams M S,and Blakeborough A.Stability and Delay Compensation for Real-Time Substructure Testing[J].Journal of Engineering Mechanics,2002,128:1276-1284.
    [2]Williams M S,Blakeborough A.Laboratory testing of structures under dynamic load:an introductory review[C].Philosophical Transaction of the Royal Society of London,2001,359:1651-1669.
    [3]Hakuno M,Shidowara M,Haa T.Dynamic Destructive Test of A Cantilevels Beam,Controlled by An Analog-computer[J].Transaction of the Japan Society of Civil Engineering.Japan,1969,171:1-9.
    [4]Nakashima M.Development,potential,and limitations of real-time online(pseudo-dynamic)testing.Philosophical Transactions of the Royal Society of London Series A—Mathematical Physical and Engineering Sciences,2001,359(1786):1851-1867.
    [5]Nakashima M,Kato H,Takaoka E.Development of real-time pseudodynamic testing[J].Earthquake Engineering and Structural Dynamics,1992.21(1):79-92.
    [6]Hussam N M,Amr S E,Billie F S,et at.Hybrid simulation for earthquake response of semirigid partial-strength steel frames[J].Journal of Structural Engineering,2013.139:1134-1148.
    [7]Nestor C,Xiuyu G,Shirley D.A real-time hybrid testing platform for the evaluation of seismic mitigation in building structures[C].20th Analysis&Computation Specialty Conference,2012 ASCE.
    [8]Griffith C,Shao X,De Lindtvan J,et al.Hybrid simulation of a wood shear wall frame[C].Structures Congress,ASCE,2013 P:2421-2432.
    [9]Yang T Y,Stojadinovic B,Moehle J.Hybrid simulation of a zipper-braced steel frame under earthquake excitation[J].Earthquake Engineering and Structural Dynamics,2009,38:95-113.
    [10]Cheng C,James M R,Theodore L K,et al,Richard Sause.Evaluation of a real-time hybrid simulation system for performance evaluation of structures with rate dependent devices subjected to seismic loading[J].Engineering Structures,35(2012):71-82.
    [11]Chen C,Ricles J M.Development of direct integration algorithms for structural dynamics using discrete control theory[J].Journal of Engineering Mechanics,2008,134(8):676-83.
    [12]Cheng C,James M R,Thomas M M,et al.Realtime hybrid testing using the unconditionally stable explicit CR integration algorithm[J].Earthquake Engineering and Structural Dynamics,2009,38:23-44.
    [13]Horiuchi T,Inoue M,Konno T,et al.Real-time hybrid experimental system with actuator delay compensation and its application to a piping system with energy absorber[J].Earthquake Engineering and Structural Dynamics,1999,28(10):1121-41.
    [14]Horiuchi T,Nakagawa M,Sugano M,et al.Development of a real-time hybrid experimental system with actuator delay compensation[C].Proc of the Eleventh World Conference on Earthquake Engineering,1996:660.
    [15]Agrawal1 A K,Yang J N.Compensation of timedelay for control of civil engineering structures[J].Earthquake Engineering and Structural Dynamics,2000,29:37-62.
    [16]Ahmadizadeh M,Mosqueda G,Reinhorn A M.Compensation of actuator delay and dynamics for realtime hybrid structural simulation[J].Earthquake Engineering and Structural Dynamics,2008,37:21-42.
    [17]王向英.结构地震模拟振动台混合试验方法研究[D].哈尔滨:哈尔滨工业大学2010.Wang Xiangying.Study on structural hybrid testing method with shaking table.Harbin:Harbin Institute of Technology,2010.(in Chinese)
    [18]Chen C,Ricles J M.Tracking error-based servo-hydraulic actuator adaptive compensation for real-time hybrid simulation[J].Journal of Structural Engineering,2010,136(4):432-440.
    [19]Wallace M I,Sieber J,Neild S A,et al.Stability analysis of real-time dynamic substructuring using delay differential equation models[J].Earthquake Engineering and Structural Dynamics,2005,34(15):1817-32.
    [20]王倩颖,吴斌,欧进萍.考虑作动器时滞及其补偿的实时子结构实验稳定性分析[J].工程力学,2007,24(2):9-15.Wang Qianying,Wu Bin,Ou Jinping.Stability analysis of real-time substructure testing considering actuator delay and compensation[J].Engineering Mechanics,2007,24(2):9-15.(in Chinese)
    [21]王向英,田石柱.子结构地震模拟振动台混合试验原理与实现[J].地震工程与工程振动,2009,29(4):46-52.Wang Xiangying,Tian Shizhu.Principle and implementation of the hybrid testing method based on substructure techniques by using shaking table[J].Journal of Earthquake Engineering and Engineering Vibration,2009,29(4):46-52.(in Chinese)

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心