采用三维非线性动力有限元方法 ,对甘肃海甸峡水电站的面板堆石坝和高趾墙的动力反应特性进行计算研究 ,详细分析了高趾墙的动力应力变形规律 ,论证了该设计方案高趾墙布置的合理性
At the preliminary design stage, the concrete facing rockfill dam is parallelly arranged together with the concrete overflow gravity dam in one scheme of Haidianxia hydropower station, in which a gravity high-toe wall with the height of nearly 50m is used, which is the highest one in China now. Its stability and safety is the key problem to the project. This paper performs a 3-D FEM dynamic analysis for the concrete facing rockfill dam and the gravity high-toe wall, analyzes its earthquake response in detail, and studies its dynamic working behavior under design earthquake condition. It is proved that the given design scheme is reasonable and feasible.
引文
[1] 宋永生,袁辉,张新.黑泉面板坝趾板设计[J].人民长江,1999,30(8):32-33
    [2] 汤,陈洪天,吴曾谋,等.公伯峡水电站混凝土面板堆石坝设计[J].水力发电,2002(8):34-38
    [3] 戴永志,顾淦臣.黄河公伯峡混凝土面板堆石坝三维非线性分析[J].红水河,2001,20(4):37-41
    [4] 孙贵平,刘小虎,李振环,等.水布垭大坝面板在强地震作用下的非线性有限元分析[J].水电能源科学,2001,19(4):27-28,73
    [5] 迟世春,林皋.混凝土面板堆石坝与库水动力相互作用研究[J].大连理工大学学报,1998,38(6):718-723
    [6] 顾淦臣.土石坝地震工程[M].南京:河海大学出版社,1989.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心