金佛山沥青混凝土心墙堆石坝坝坡稳定性分析
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
以重庆金佛山沥青混凝土心墙堆石坝工程为例,同时考虑非线性及线性强度指标,采用极限平衡法分析了大坝竣工期、蓄水期、水位骤降期及地震作用下的坝坡稳定性。结果表明,该堆石坝在7种计算方法下坝坡安全系数均满足规范要求,采用非线性强度指标时危险滑弧深度贯通,计算结果合理。
Taking Jinfo Mountain asphalt concrete core rockfill dam for an example,the limit equilibrium method is used to analyze the stability of the dam boundary in completion period,storage water period,water level sudden drop period and earthquake situation by considering non-linear and linear strength index.The results show that the safety factors of the dam slope obtained by 7 kinds of methods are satisfied with the specification requirements;the dangerous slide arc will deeply penetrated by using nonlinear strength index,and the evaluation result is more reasonable.
引文
[1]Bishop A W.The Use of the Slip Circle in the StabilityAnalysis of Slops[J].Geotechnique,1955,5(1):7-17.
    [2]姚爱军,薛廷河.复杂边坡稳定性评价方法与工程实践[M].北京:科学出版社,2008.
    [3]王俊杰,陈锦璐.阶梯型均质边土坡的稳定性分析[J].水电能源科学,2011,29(1):73-75.
    [4]中国水电顾问集团西北勘测设计研究院,武汉大学.碾压式土石坝设计规范(DL/T5395-2007)[S].北京:中国电力出版社,2008.
    [5]杨天鸿,唐春安,徐涛,等.岩石破裂过程的渗流特性——理论、模型与应用[M].北京:科学出版社,2004.
    [6]李亮,褚雪松,庞峰,等.地震边坡稳定性分析的拟静力方法适用性探讨[J].世界地震工程,2012,28(2):57-63.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心