摘要
介绍了汉坪嘴水电站大坝在"5·12"地震后的震损情况、水库运行情况和大坝安全监测成果分析,提出高震区水电站大坝设计中应注意的问题。
This paper introduced the damage caused by earthquake of Hanpingzui dam, as well as the operation and safety monitoring after earthquake. Further more, the issues need attention in design of dam located in earthquake area were pointed out here.