汶川地震后对建筑结构设计施工的思考
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
通过对汶川地震中底框结构、整体失稳、节点区破坏、短柱破坏、柱破坏、砌体结构破坏、楼梯间破坏、楼盖破坏、屋顶小房间破坏等典型案例分析,提出强化区别对待抗震管理、强化概念设计理念、对于人员密集的建筑工程设计、常规结构体系设计、加强节点处施工质量的几点建议,进一步提出施工缝留设、填充墙及楼梯对计算模型影响的问题。
Through analysis on typical cases in Wenchuan earthquake of bottom frame structures,integral instability,destruction of joint areas,short column destruction,column destruction,masonry structure destruction,staircase destruction,roof destruction and roof room destruction,the suggestions of strengthening earthquake management respectively,strengthening concept design idea,design for dense people engineering,ordinary structure design and strengthening joint quality are put forward.Furthermore,layout for construction joints,influence of filler wall and stairs on calculation model is indicated.
引文
[1]GB50011—2001建筑抗震设计规范[S].北京:中国建筑工业出版社,2001.
    [2]GB50009—2001建筑结构荷载规范[S].北京:中国建筑工业出版社,2002.
    [3]GB50023—2009建筑抗震鉴定标准[S].北京:中国建筑工业出版社,2009.
    [4]JGJ116—2009建筑抗震加固技术规程[S].北京:中国建筑工业出版社,2009.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心