法门寺合十舍利塔震后裂缝处理技术研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
法门寺合十舍利塔工程是"5·12"汶川大地震发生时在建的陕西省重点工程,通过对该工程在汶川地震后的震害调研、地震现场考察,收集了大量有关该建筑结构震害资料,介绍了受汶川地震影响的法门寺合十舍利塔的震害情况,对裂缝产生的原因作了初步分析,并根据具体破坏特征提出表面封闭、表面扩大封闭、压力灌浆、补强钢带等相应处理(加固)措施.
The project of the Palms Together Pagoda in the Famen Temple are the main projects in Shaanxi Province.It was under construction when Wenchuan earthquakes occurred.The large amount of data were collected about the building structure damage level based on the damaged buildings and scene investigation after earthquakes.These data reflected the earthquake effect on the Palms Together Pagoda in Famen Temple.And causes of the damage are analyzed and some measures such as closed surface and pressure grouting and steel reinforcement are provided.The treatment technology discussed in the article would be valuable for other similar projects.
引文
[1]郝会山,张顺强.汶川地震宝鸡中小学房屋震害分析[J].工程抗震与加固改造,2008,30(4):77-83.HAO Hui-shan,ZHANG Shun-qiang.Wenchuan MS 8.0 earthquake damage analysis of pri mary and secondaryhousing in Baoji[J].Engineering and Seismic Reinforcement,2008,30(4):77-83.
    [2]胡长明.扣件联接钢结构试验及其理论研究[D].西安:西安建筑科技大学,2008.HU Chang-ming.Studies on Experi ment and Theory of Steel Construction Connected with Fasteners[D].Xi′an:Xi′an University of Architecture and Technology,2008.
    [3]王汝恒,贾彬,张誉,等.绵阳城区各类建筑结构在汶川地震中的震害特征[J].工程抗震与加固改造,2008,30(4):24-296.WANG Ru-heng,JIABin,ZHANG Yu,et al.All types of building structures in Wenchuan earthquake damage char-acteristic of Mianyang[J].Engineering and Seismic Reinforcement,2008,30(4):24-296.
    [4]张勇.混凝土现浇板裂缝产生的原因及防治[J].河套大学学报,2008,5(2):85-90.ZHANG Yong.Cracks in concrete cast-in-place plate Causes and Prevention[J].Journal of Hetao University,2008,5(2):85-90.
    [5]梅利芳.钢筋混凝土梁碳纤维加固抗剪承载力分析[J].湖北工业大学土木工程与建造学报,2008(2):24-25.MEI Li-fang.Reinforced concrete beamshear strength of carbonfiber reinforced Analysis[J].Journal of Technologycivil engineering and construction of Hubei University,2008(2):24-25.
    [6]孙静,杜立军.玻璃纤维布加固有预加载钢筋混凝土梁的受弯试验研究[J].西安建筑科技大学学报:自然科学版,2007,39(6):779-784.SUNJing,DU Li-jun.Budd-Chiari inherent in the glass fiber reinforced concrete beams pre-load the bending teststudy[J].J.Xi′an Univ.of Arch.&Tech.(Natural Science Edition),2007,39(6):779-784.
    [7]李玉.预制钢筋混凝土梁受压区侧面粘钢对短期刚度的影响[J].西安建筑科技大学学报:自然科学版,2007,39(5):646-651.LI Yu.Pre-cast reinforced concrete beamsteel sticky side of the zone pressure on short-termi mpact onthe stiffness[J].J.Xi′an Univ.of Arch.&Tech.(Natural Science Edition),2007,39(5):646-651.
    [8]卜良桃,宋力,施楚贤.碳纤维板加固钢筋混凝土梁的抗弯试验和理论研究[J].建筑结构学报,2007,28(1):72-79.BO Liang-tao,SONG Li,SHI Chu-xian.Carbon fiber reinforced concrete beambending experi ments and theoreticalresearch[J].Journal of Building Structures,2007,28(1):72-79.
    [9]吕西林.建筑结构加固设计[M].北京:科学出版社,2001.LU Xi-lin.Strengthening design of building structure[M].Beijing:Science Press,2001.
    [10]赵祥,王社良,刘瑞杰,等.带边框柱剪力墙模型抗震性能试验研究[J].西安建筑科技大学学报:自然科学版,2004,36(3):275-279.ZHAO Xiang,WANGShe-liang,LI U Rui-jie,et al.Border wall with columns model Experi mental study on seismicbehavior[J].J.Xi′an Univ.of Arch.&Tech.(Natural Science Edition),2004,36(3):275-279.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心