矿震成核过程的公里尺度研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
成核过程是地震机理研究的重要部分.通过岩石实验、高温高压和数值模拟认为,地震成核的临界尺度为大地震总破裂长度的十分之一,一般为10~20 km左右;地震成核时间从年到秒、甚至毫秒.本文利用山东省宁阳县华丰煤矿立体台网的岩爆观测,进行了公里尺度的破裂成核过程实验研究.通过对华丰煤矿1995年2月~1996年5月期间的地脉动记录和12000次小震记录资料的分析,计算了它们的地脉动、S波和P波振幅比以及S波波峰的到时差,得到ML=2.9矿震的成核时间为50天,成核临界尺度为5 km.
Nucleation process was an important part of earthquake mechanism.Through rock experiment,high temperature or high press and numerical model,we hold that the time critical scale of earthquake nucleation is 1/10,it generally is about 10~20km;the time of earthquake is from year to minute,so far as to millisecond.In this paper,we used rock-explosion observation in Hurfeng coal mine,Ningyang County in Shandong Province to study km-scale nucleation process.seismic pulse and 12,000 small rockbursts recorded at Huafeng seismograph station was analyzed between Feb.in 1995 and May in 1996.The result shows that the critical scale of earthquake nucleation is about 5 km,and the time of earthquake nucleation is about 50 days for a M_L=2.9 mine shock.
引文
[1]菊地正幸,竹内均.SH型地震[J].地震,1970,23(2):304~312.
    [2]松浦充宏.地震为什么发生、是怎样发生的———探索地震的起因[J].地震科技情报,1995,5:6~9.
    [3]Dieterich J H.A model for the nucleation of earthquake slip[J].Am.Geophys.Union,M.Ewing,Geophys.Monogr,1986,6:37~47.
    [4]Ohnaka M.Earthquake source nucleation[J].Tectonophysics,1992,211(4):149~178.
    [5]郭增建,秦保燕.地震成因与地震预报[M].北京:地震出版社,1991.
    [6]牛志仁,苏刚.震源育的追赶模式[J].地球物理学报,1976,19(3):177~195.
    [7]秦保燕,姚兰予.汪进,李亚荣.由地震图上的终止相研究1976年松藩继发性大震的震源破裂过程[J].西北地震学报,1990,12(2):1~15.
    [8]郑治真.我国前兆地声的观测与研究[J].地球物理学报,1994,37(增刊):251~259.
    [9]王妙月,杨懋源,胡毓良,李自强,陈运泰,金严,冯瑞.新丰江水库地震的震源机制及其成因的初步探讨[J].中国科学,1976,1:85~97.
    [10]郑治真,刘元壮.提取慢S波初至的自适应方法及S波分裂在地震趋势估计中的应用研究[J].中国地震,1994,10(增刊):1~8.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心