汶川地震断裂带科学钻探项目WFSD-3-P孔钻探施工概况
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
主要介绍了汶川地震断裂带科学钻探项目WFSD-3-P孔的地层情况、施工过程、钻井液技术、事故的处理与预防技术。在钻探施工中,采取了高密度低失水泥浆体系和反复扫孔、起钻中途回灌泥浆的措施,解决了断层泥缩径、岩层破碎、钻孔坍塌扩径的技术难题,并取得了原状性完好的岩心。
This article introduces the drilling process of WFSD-3-P of Wenchuan earthquake fault scientific drilling(WFSD) project.A series of technical measures of high-density and low-filtration drilling fluid system,repeated reaming and mud recharging in pipe trip were taken to overcome drilling difficulties,such as borehole shrinkage in fault gouge formation,rock breaking and collapsed borehole enlarging.As the result,high quality undisturbed cores have been obtained and rich drilling experiences in earthquake fault have been accumulated.
引文
[1]许志琴,李海兵,吴忠良.汶川地震和科学钻探[J].地质学报,2008,82,(12).
    [2]张伟,贾军,胡时友.汶川地震科学钻探项目的概况和钻探技术[J].探矿工程(岩土钻掘工程),2009,36(S1).
    [3]胡时友,宋军,张伟,等.汶川地震断裂带科学钻探(WFSD)项目钻探和测井课题的组织实施与管理[J].探矿工程(岩土钻掘工程),2009,36(12).
    [4]樊腊生,贾军,吴金生,等.汶川地震断裂带科学钻探一号孔(WFSD-1)钻探施工概况[J].探矿工程(岩土钻掘工程),2009,36(12).
    [5]李之军,陈礼仪,贾军,等.汶川地震断裂带科学钻探一号孔(WFSD-1)断层泥孔段泥浆体系的研究与应用[J].探矿工程(岩土钻掘工程),2009,36(12).
    [6]王焕.汶川地震断裂带结构特征及其与地震活动性的关系[D].北京:中国地质大学(北京),2011.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心