超前综合探水技术在煤矿的应用
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
针对晶鑫煤矿二盘区3203工作面水文地质条件复杂、地质构造带涌水量异常增大等问题,提出了超前探水与三维地震勘测相结合的综合探测技术体系,探明了盘区内矿井水分布及涌水量大小,解释了构造带涌水量增大的原因是顶板砂岩水沿采动裂隙涌出,降低了钻探工程量,同时增加了钻探结果的可靠性与准确性。
In view of the complex hydrogeological conditions and the abnormal increase of water inflow in tectonic belt in 3203 working face of No.2 panel in Jingxin coal mine,the paper puts forward an integrated detection technology system combining the advanced water-detection and 3D seismic survey technology.It ascertains the mine water distribution in panel and the water inflow;explains the reason water inflow increase in tectonic belt is for the roof sandstone water gushing along mined crack;reduces the drilling work amount and increases the reliability and accuracy of drilling results.
引文
[1]潘冬明,程久龙,李德春.利用三维地震技术探测覆岩变形破坏研究[J].采矿与安全工程学报,2010(4)
    [2]韩洪涛.三维地震勘探技术的发展方向[J].煤炭技术,2011(6)
    [4]张进铎.地震解释技术现状及发展趋势[J].地球物理学进展,2006(2)
    [5]邵东梅,戴玉权,刘红卫.承压含水层中下山掘进探放水技术[J].煤炭工程,2009(11)
    [6]刘存玉,综合防治水技术在梧桐庄矿的研究与应用[J].中国煤炭,2009(12)

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心