汶川特大地震灾后对口援建系统工程的综合集成模式
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
在深入调查地震灾区情况的基础上,认真研究对口援建方案,分析对口援建开放的复杂巨系统的框架、时空、运行等结构及其整体特性;提出地震灾后对口援建系统工程的综合集成模式,分别就对口援建集成工程的运作模式和具体实施框架进行讨论,并就援建系统工程、迎建系统工程和保障系统工程等其体实施工程做了细致的阐述.
Basing on making in-depth investigation of earthquake-stricken areas,thoroughly studying aided reconstruction programs and the analysis of overall characters and frameworks of corresponding aided reconstructions' open complex giant system as well as its configuration,spatial structure and operation,the paper proposes the mode of meta-synthesis of corresponding aided reconstructions systems engineering and respectively study the mode of meta-synthesis of corresponding aided reconstructions systems and its concrete implementation plans.Also,the paper elaborates the implementation of corresponding aided reconstruction systems engineering,aided reconstruction preparing systems engineering and security systems engineering.
引文
[1]Modi N.Gujarat earthquake reconstruction and rehabilitation policy[C]//The Gujarat State Disaster Management Authority,Gujarat,2000.
    [2]Nigg J M.The Lorna Prieta,California,earthquake of October 17,1989-recovery,mitigation,and reconstruction[C]//U.S.Department of the Interior,1998.
    [3]Itsuki N.Comparative study on urban reconstruction process after earthquake among Turkey,Taiwan and Japan[D].Tokyo:TokyoMetropolitan University,2004.
    [4]Hirayama Y.Collapse and reconstruction:Housing recovery policy in Kobe after the Hanshin Great Earthquake[J].HousingStudies,2000,15(11):111-128.
    [5]Martinez E.El Salvador:Post-earthquake housing reconstruction programme[J].Open House International,2005,30(4):29-32.
    [6]Wu J Y,Lindell M K.Housing reconstruction after two major earthquakes:The 1994 northridge earthquake in the united states andthe 1999 Chi-Chi earthquake in Taiwan[J].Disaster,2004,28(1):63-81.
    [7]Hanes J E.Urban planning as an urban problem:The reconstruction of Tokyo after the great kanto earthquake[J].SeisakuKagaku,2000,7(3),123-137.
    [8]Yasui E.Community vulnerability and capacity in post-disaster recovery:The cases of Mano and Mikura neighborhoods in the wakeof the 1995 Kobe earthquake[D].Vancouver:University of British Columbia,2007.
    [9]Handrigan M T,Becker B M,Jagminas L,et al.Emergency medical services in the reconstruction phase following a majorearthquake:A case study of the 1988 Armenia earthquake[J].Prehospital Disaster Med,1998,13(1):35-40.
    [10]徐玖平,卢毅.地震灾后重建系统工程的综合集成模式[J].系统工程理论与实践,2008,28(7):1-16.Xu J P,Lu Y.Meta-synthesis pattern of systems engineering of post-earthquake reconstructions[J].Systems Engineering-Theory&Practice,2008,28(7):1-16.
    [11]徐玖平,杨春燕,马艳岚,等.汶川特大地震对口援建政策实施情况及政策建议研究报告[R].四川大学研究报告,SCUUDLa-08-17,2008.08.Xu J P,Yang C Y,Ma Y L,et al.The research report of implementation and policy recommendations of counterparts aid in post-Wenchuan earthquake[R].Sichuan University Study,SCUUDLa-08-17,2008.08.
    [12]戴汝为,李耀东.基于综合集成的研讨厅体系与系统复杂性[J].复杂系统与复杂性科学,2004,1(4):1-24.Dai R W,Li Y D.Researches on hall for workshop of meta-synthetic engineering and system complexity[J].Complex Systems andComplexity Science,2004,1(4):1-24.
    [13]于景元,周晓纪.从定性到定量综合集成方法的实现和应用[J].系统工程理论与实践,2002,22(10):26-32.Yu J Y,Zhou X J.The realization and application of meta-synthesis[J].Systems Engineering-Theory&Practice,2002,22(10):26-32.
    [14]于景元.钱学森综合集成体系[J].西安交通大学学报,2004,26(6):40-47.Yu J Y,Qian Xuesen synthesization and integration system space flight[J].Journal of Xi′an Jiaotong University,2004,26(6):40-47.
    [15]沈小平,马士华.综合集成方法论研究[J].系统工程,2005,23(10):107-110.Shen X P,Ma S H.On application of meta-synthetic methodology[J].Systems Engineering,2005,23(10):107-110.
    [16]于景元,周晓纪.从综合集成思想到综合集成实践——方法、理论、技术、工程[J].管理学报,2005,2(1):4-10.Yu J Y,Zhou X J.Meta syntheses:From the thought to its practice-the methodology,theory,technology and engineering[J].Chinese Journal of Management,2005,2(1):4-10.
    [17]于景元.关于综合集成的研究——方法、理论、技术、工程[J].交通运输系统工程与信息,2005,5(1):4-10.Yu J Y.Meta-synthesis:Its method,theory,technology and engineering[J].Journal of Transportation Systems Engineering andInformation Technology,2005,5(1):4-10.
    [18]操龙兵,戴汝为.综合集成与决策[J].计算机研究与发展,2003,40(4):531-537.Long C B,Dai R W.On meta-synthesis and decision making[J].Journal of Computer Research and Development,2003,40(4):531-537.
    [19]卢明森.“从定性到定量的综合集成法”的形成与发展[J].中国工程科学,2005,7(1):9-16.Lu M S.The formation and development of“Meta-synthesis”[J].Engineering Science,2005,7(1):9-16.
    [20]于景元,周晓纪.综合集成方法与总体设计部[J].复杂系统与复杂性科学,2004,1(1):20-26.Yu J Y,Zhou X J.Meta-syntheses and department of integrative system design[J].Complex Systems and Complexity Science,2004,1(1):20-26.
    [21]徐玖平,朱洪军.汶川特大地震灾后体育恢复重建问题分析与对策报告[R].四川大学研究报告,SCUUDLa-08-13,2008.07.Xu J P,Zhu H J.The analysis and Countermeasures Report of Physical Rehabilitation in post-Wenchuan earthquake[R].SichuanUniversity Study,SCUUDLa-08-13,2008.07.
    [22]徐玖平,王鹤,刘雪梅,等.汶川特大地震灾后学校教育重建突出问题分析与对策报告[R].四川大学研究报告,SCUUDLa-08-04,2008.06.XU J P,Wang H,Liu X M,et al.School education reconstruction outstanding problems analysis and countermeasures report in post-Wenchuan earthquake[R].Sichuan University Study,SCUUDLa-08-04,2008.06.
    [23]徐玖平,吴敏,马艳岚.汶川特大地震灾后社区恢复重建的问题分析及对策报告[R].四川大学研究报告,SCUUDLa-08-12,2008.07.Xu J P,Wu M,Ma Y L.The analysis and countermeasures report of community rehabilitation in post-Wenchuan earthquake[R].Sichuan University Study,SCUUDLa-08-12,2008.07.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心