引文
[1]咸大庆.基础工程事故的主要原因剖析[J].岩土工程界,2004,7(4):11-13.
[2]苑莲菊,李振全,武胜忠,等.工程渗流力学及应用[M].北京:中国建材工业出版社,2001.
[3]李廷春,李术才,陈卫忠,等.考虑水的耦合与否在隧道稳定计算中造成的结果差异对比[J].岩石力学与工程学报,2003,22(增刊1):2159-2163.LI Ting-chun,LI Shu-cai,CHEN Wei-zhong,et al.Comparison of computing results with and without water coupled in simulation on subsea tunnel stability[J].Chinese Journal of Rock Mechanics and Engineering,2003,22(Supp.1):2159-2163.
[4]李廷春,李术才,陈卫忠,等.厦门海底隧道的流固耦合分析[J].岩土工程学报,2004,26(3):397-401.LI Ting-chun,LI Shu-cai,CHEN Wei-zhong,et al.Coupled fluid-mechanical analysis of Xiamen subsea tunnel[J].Chinese Journal of Geotechnical Engineering,2004,26(3):397-401.
[5]陈卫忠,于洪丹,郭小红,等.厦门海底隧道海域风化槽段围岩稳定性研究[J].岩石力学与工程学报,2008,27(5):873-884.CHEN Wei-zhong,YU Hong-dan,GUO Xiao-hong,et al.Study of stabilities of surrounding rocks through weathered slot in Xiamen subsea tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(5):873-884.
[6]彭海阔,孟光,丁麒,等.在地震激励下动水压力对沉管隧道的影响[J].上海交通大学学报,2008,42(6):1027-1031.PENG Hai-kuo,MENG Guang,DING Qi,et al.The influence of hydrodynamic pressure on immersed tunnel under earthquake excitation[J].Journal of Shanghai Jiaotong University,2008,42(6):1027-1031.
[7]严绍洋,李亮辉,高燕希,等.公路隧道开挖渗流场的有限差分法分析[J].中外公路,2007,27(6):120-123.
[8]赵建宇.清水隧道围岩稳定性流固耦合研究[J].岩土工程技术,2007,21(5):257-263.ZHAO Jian-yu.Fluid-solid coupling analysis of Qingshui railway tunnel[J].Geotechnical Engineering Technique,2007,21(5):257-263.
[9]裴桂红,吴军,刘建军,等.深基坑开挖过程中渗流一应力祸合数值模拟[J].岩石力学与工程学报,2004,23(增刊2):4975-4978.PEI Gui-hong,WU Jun,LIU Jian-jun,et al.Numerical modeling of seepage-stress coupling of deep foundation pit excavation[J].Chinese Journal of Rock Mechanics and Engineering,2004,23(Supp.2):4975-4978.
[10]刘继国,朱光仪,郭小红,等.厦门海底隧道建设中涌水量流固耦合数值模拟[J].现代隧道技术,2006,43(2):34-37.LIU Ji-guo,ZHU Guang-yi,GUO Xiao-hong,et al.Coupled fluid-mechanical numerical simulation on water inflow capacity in Xiamen subsea tunnel during construction[J].Modern Tunnelling Technology,2006,43(2):34-37.
[11]漆泰岳,高波,马亮.富水软土地层地铁开挖地表沉降离心模型试验[J].西南交通大学学报,2006,41(2):184-189.QI Tai-yue,GAO Bo,MA Liang.Centrifugal model test for ground surface subsidence caused by metro tunneling in saturated soft clay strata[J].Journal of Southwest Jiaotong University,2006,41(2):184-189.
[12]吉小明.隧道工程中水力耦合问题的探讨[J].地下空间与工程学报,2006,2(1):149-154.JI Xiao-ming.Discussion on the research of coupled solid and fluid flow in tunnel engineering[J].Chinese Journal of Underground Space and Engineering,2006,2(1):149-154.
[13]吉小明.隧道开挖的围岩损伤扰动带分析[J].岩石力学与工程学报,2005,24(10):1697-1702.JI Xiao-ming.Study of mechanical and hydraulic behavior of tunnel surrounding rock masses in excavation-disturbed zone[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(10):1697-1702.
[14]唐杰军,凌同华.山区公路分离式隧道围岩流固耦合数值分析[J].矿业研究与开发,2009,29(6):24-26.TANG Jie-jun,LING Tong-hua.Numerical simulation on surrounding rock of separated highway tunnels based on fluid-solid interaction[J].Mining Research and Development,2009,29(6):24-26.
[15]GU C S,SU H Z,ZHOU H.Study of coupling model of seepage field and stress-field for rolled control concrete dam[J].Applied Mathematics and Mechanics(English Edition),2005,26(3):355-363.
[16]薛强,梁冰,马士进.边坡失稳系统的固流耦合模型[J].山东科技大学学报(自然科学版),2001,20(2):87-89.XUE Qiang,LIANG Bing,MA Shi-jin.Solid-fluid coupling model of the system of slope failure[J].Journal of Shandong University of Science and Technology(Natural Science),2001,20(2):87-89.
[17]SMINTH I M,GRIFFITHS D V.有限元方法编程(第3版)[M].王菘,周坚鑫,王来,等译.北京:电子工业出版社,2003.