地铁列车与城际铁路列车的耦合动力响应分析
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
以天津市津滨轻轨下穿城际铁路工程为研究背景,基于ABAQUS显式动力分析模块建立了三维有限元与无限元相结合的模型,通过多点输入方式实现了列车荷载在空间的移动,计算了高速列车以不同速度运行、单列地铁列车运行、两列地铁列车相向运行耦合等不同工况下体系的振动响应,对比分析了不同工况下的加速度和位移响应.
Based on Jinbin mass transit under-crossing intercity rail,the multi-vibration calculating model of finite element and infinite element was created based on the ABAQUS/Explicit module,and train loads were imported by the multi-point input method.Besides,the dynamic response of the surrounding environment under the condition of high-speed train in different speed,single subway train vibration,two subway train coupling vibration etc.were calculated,and the acceleration and displacement in different conditions were analyzed.
引文
[1]刘雪珠,陈国兴.轨道交通荷载下路基土的动力学行为研究进展[J].防灾减灾工程学报,2008,28(2):248-255.LIU Xue-zhu,CHEN Guo-xing.Advances in researches on mechanical behavior of subgrade soils under repeated-load of high-speed track vehicles[J].Journal of Disaster Prevention and Mitigation Engineering,2008,28(2):248-255.
    [2]Wilson G P.Control of ground-borne noise and vibration[J].Journal of Sound and Vibration,1983,87(2):339-350.
    [3]Melke J.Noise and vibration from underground railway lines:Proposals for a prediction procedure[J].Journal of Sound and Vibration,1988,120(2):391-406.
    [4]Hunt H E M.Measurement and modeling of trafficinduced ground vibration[D].London:Cambridge University,Department of Engineering,1988.
    [5]Ng S L D.Transmission of ground-borne vibration from surface railway trains[D].London:Cambridge University,Department of Engineering,1995.
    [6]Forrest J A.Vibration-isolation performance of floating slab track used in underground railways[C]//Fifth Intenational Congress on Sound and Vibration.Adelaide:I1AV,1997:15-18.
    [7]Forrest J A.Modelling of ground vibration from underground railways[D].London:Cambridge University,Department of Engineering,1999.
    [8]Andersen L,Nielsen S R K.Reduction of ground vibration by means of barriers or soil improvement along a railway track[J].Soil Dynamics and Earthquake Engineering,2005,25(7):701-716.
    [9]李亮,张丙强,杨小礼.高速列车振动荷载下大断面隧道结构动力响应分析[J].岩石力学与工程学报,2005,24(23):4259-4265.LI Liang,ZHANG Bing-qiang,YANG Xiao-li.Analysis of dynamic response of large cross-section tunnel under vibrating load induced by high speed train[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(23):4259-4265.
    [10]梁波,蔡英.不平顺条件下高速铁路路基的动力分析[J].铁道学报,1999,21(2):84-87.LIANG Bo,CAI Ying.Dynamic analysis on subgrade of high speed railways in geometric irregular condition[J].Journal of The China Railway Society,1999,21(2):84-87.
    [11]张涛.地下隧道地震响应分析[D].天津:天津大学建筑工程学院,2008.
    [12]费康,张建伟.ABAQUS在岩土工程中的应用[M].北京:中国水利水电出版社,2010.
    [13]刘雪珠,陈国兴,储勇.列车引起的地基土应力状态变化的三维有限元分析[J].地震工程与工程振动,2010,30(2):159-166.LIU Xue-zhu,CHEN Guo-xing,CHU Yong.Stress ststes of soil elements induced by train passage on the basis of 3D finite element analysis[J].Journal of Earthquake Engineering and Engineering Vibration,2010,30(2):159-166.
    [14]刘晶波,王振宇,杜修力,等.波动问题中的三维时域粘弹性人工边界[J].工程力学,2005,22(6):46-51.LIU Jing-bo,WANG Zhen-yu,DU Xiu-li,et al.Three-dimensional visco-elastic artificial boundaries in time domain for wave motion problems[J].Engineering Mechanics,2005,22(6):46-51.
    [15]白冰,李春峰.地铁列车振动作用下近距离平行隧道的弹塑性动力响应[J].岩土力学,2009,30(1):123-128.BAI Bing,LI Chun-feng.Elastoplastic dynamic responses of close parallel metro tunnels to vibration loading[J].Rock and Soil Mechanics,2009,30(1):123-128.
    [16]华东水利学院土力学教研室.土工原理与计算[M].北京:水利电力出版社,1984.
    [17]戴林发宝.高速列车振动作用下水-土-管片耦合及砂土液化分析[D].成都:西南交通大学土木工程学院,2011.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心