某偏压连拱隧道地质病害地震CT探测及病害处理
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
文章介绍了某高速公路偏压连拱隧道在衬砌结构发生严重破坏和隧道上方产生规模较大的山体开裂的情况下 ,所采取的病害处理措施。首先通过地震CT手段对该连拱隧道出现的工程地质病害进行探测 ;然后据此探测结果对该连拱隧道施工全过程进行动态施工模拟研究 ;最后分析导致该连拱隧道衬砌结构发生严重破坏的可能原因。结合现场病害调查结果 ,提出了相应的建议处理方案和施工过程中应注意的几个关键性问题
The paper introduces the measures adopted to treat the severe defects in the lining of an unsymmetrically loaded multi-arched highway tunnel with large-scale cracks in the mountain mass above it. Firstly, seism CT method was used to detect the defects of the engineering geology of the tunnel. Secondly, according to the detected results of the seism CT, dynamic simulation of full-stage construction was performed. Finally, possible causes leading to the severe lining destruction were analyzed. According to the in-situ defect investigation results, corresponding measures and some key problems to be noticed during construction are put forward.
引文
[1]何振起,李海,梁彦忠.利用地震发射法进行隧道施工地质超前预报[J].铁道工程学报,2000(4):81~85
    [2]毛建安.秦岭特长隧道施工地质超前预报技术的应用[J].世界隧道,1998(4):36~39
    [3]夏才初,刘金磊.相思岭连拱隧道中隔墙应力研究[J].岩石力学与工程学报,2000,19(增):1115~1119
    [4]彭定超,袁勇,章勇武.开挖施工方式对连拱隧道中隔墙影响的空间分析[J].现代隧道技术.2002,39(1):47~53.
    [5]朱合华,叶斌.不对称大跨度连拱隧道施工力学研究(待发表).
    [6]叶斌,朱合华,李志厚.不对称连拱隧道施工过程三维有限元模拟分析(待发表).
    [7]刘庭金,李志厚,朱合华.存在断裂带条件下偏压连拱隧道施工方案模拟对比分析(待发表).
    [8]周玉宏,赵燕明,程崇国.偏压连拱隧道施工过程的优化研究[J].岩石力学与工程学报,2002,21(5):679~683

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心