四川绵茂公路东河3号大桥地震响应分析
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
四川绵茂公路上的东河3号大桥为新型波形钢腹板曲线梁桥。针对该新型桥梁,分别从有限元模型的建立、地震波输入方向的组合、地震动输入主方向的确定以及结构的动力特性和地震反应等几方面进行研究。该桥采用波纹钢腹板箱梁,可有效降低自重,具有较好的抗弯、抗扭刚度,采用墩梁固结可降低墩顶位移、增大桥梁的抗侧刚度,体系较合理;曲线梁桥地震波输入主方向对桥梁的地震反应影响较大;在计算分析时,对波形钢腹板进行合理等效可较准确地分析该类新型桥梁的地震反应,曲线梁桥的扭转振型与直桥相比出现较早且更明显;对于曲率不大的曲线梁桥,地震输入方向的较小变化对各内力的影响不大。
The Donghe No.3 Bridge in Sichuan Mianmao Road is a new type of curved girder bridge with corrugated steel webs.The construction of finite element model,the combination of directions about seismic input,the confirmation of main directions about seismic input,dynamic characteristics and seismic response of structure were studied.The bridge is a reasonable system that box girder with corrugated steel webs was used to reduce self weight and provide good bending and torsional stiffness.Consolidating with pier and girder was used to reduce the pier top displacement,and increase the lateral stiffness of the bridge.The main directions of seismic input have remarkable effect on the seismic response of bridge.The seismic response of the new bridge was analyzed accurately through making reasonable equivalent to the girder with corrugated steel webs.Compared with the straight bridge,the torsional vibration mode appeared earlier and more clearly in the curved girder bridge;for the small curvature bridge,it has little effect on the internal force during changing the directions of seismic input.
引文
[1]周勇军.高墩大跨曲线连续刚构桥梁地震响应的设计参数研究[D.]西安:长安大学,2006(Zhou Yongjun.Study on design parameters affecting the seismic responseof curved continuous rigid frame bridges with long-spanand high-pier[D.]Xi’an:Changa’n University,2006(inChinese))
    [2]朱东生,刘世忠,虞庐松.曲线桥地震反应研究[J].中国公路学报,2002,15(3):42-48(Zhu Dongsheng,LiuShizhong,Yu Lusong.Research on seismic response ofcurved girder bridges[J.]China Journal of Highway andTransport,2002,15(3):42-48(in Chinese))
    [3]肖卓,赵青.曲线箱梁桥的地震反应分析[J.]工程抗震与加固改造,2009,31(3):9-15(Xiao Zhuo,ZhaoQing.Seismic response analysis of curved box-girdersbridge[J.]Earthquake Resistant Engineering andRetrofitting,2009,31(3):9-15(in Chinese))
    [4]栗光华.高墩大跨度连续刚构桥地震响应分析[D.]北京:北京交通大学,2007(Li Guanghua.Seismic responseanalysis of continuous rigid frame bridge with large spanand high pier[D].Beijing:Beijing Jiaotong University,2007(in Chinese))

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心