摘要
砌体结构的抗压强度远大于抗拉、抗剪强度,适合应用于受压为主的构件。由于其具有自重大,材料呈脆性,抗拉、抗剪、抗弯能力低等缺点,使得其抗震性能较差。针对农村地区砖砌体结构房屋抗震加固改造工程量大面广,所需资金缺口大、来源匮乏的现状,充分发挥后张预应力技术的优势,提出一种适用于既有砌体结构的新型抗震加固技术。在此基础上,通过5片构件(1片未加固墙片和4片加固墙片)抗震加固实验验证了此新型抗震加固方法的有效性和优越性。试验结果表明,与相同设计的未加固墙体相比,后张预应力加固无构造柱砖砌体墙体的抗剪承载力、变形能力和耗能能力均有大幅度提高,提高幅度高于2倍。该后张预应力加固既有砌体结构新技术具有施工简便、质量容易控制、工期较短、对结构影响小、造价低廉等优点,具有广阔的应用前景。
In this paper,to solve problem of seismic retrofitting wide for existing brick masonry in the rural area,a novel seismic strengthening technology is proposed based on the advantage of post-tension technology. And the test results on 5 no structural columns clay brick shear walls retrofitted using post-tensioned tendons and subjected to quasi-static reversed cyclic loadings. One wall was built as a non-retrofitted wall,and the remaining four were retrofitted using post-tensioned high strength steel strands. Test results indicated that the mechanical behaviors and the failure patterns of the retrofitted walls could be significantly improved. The in-plane shear strength of the post-tensioned brick walls observed could be range above two times the strength of the non-retrofitted wall. The proposed seismic retrofitting technology have the advantages of simple construction,easy to control quality,short time to build,small influence on the existing structure,low cost and so on.
引文
[1]杨丽辉.砖砌体民居抗震性能试验研究与连续倒塌数值分析[D].北京:北京交通大学,2011:12-17.YANG Lihui.Experimental study on the seismic performance of brick masonry residence and continuous collapse numerical analysis[D].Beijing:Beijing Jiaotong University,2011:12-17(in Chinese)
    [2]程耿东,李刚.基于功能性的结构抗震设计中一些问题的探讨[J].建筑结构学报,2000,21(1):1-8.CHENG Gendong,LI Gang.Discussion on some problems of aseismic structures based on functional design[J].Journal of Building Structures,2000,21(1):1-8.(in Chinese)
    [3]清华大学,西南交通大学,北京交通大学土木工程结构专家组.汶川地震建筑震害分析[J].建筑结构学报,2008,29(4):1-9.Experts in civil engineering structure.Analysis on building seismic damage in Wenchuan earthquake[J].Journal of building structures,2008,29(4):1-9.(in Chinese)
    [4]中国建筑科学研究院.2008年汶川地震建筑震害图片集[M].北京:中国建筑工业出版社,2008.China Academy of Building Research.Photos album of building damage in 2008 Wenchua earthquake[M].Beijing:China Architecture&Building Press,2008.(in Chinese)
    [5]Abdullah Katsuki T..Shear strengthening of reinforced concrete columns using ferrocement jackets[J].ACI Structural journal,2001,98(5):696-704.
    [6]Ye L.P.,Zhang K.,Zhao S.H.,et al.Experimental study on seismic strengthening of RC columns with wrapped CFRP sheets[J].Construction and Building Materials,2003,17(5):499-506.
    [7]Bruce R.Ellinwood.Earthquake risk assessment of building structures[J].Reliability Engineering and System Safety,2001,74:251-261.
    [8]刘航,高会宗,杨学中,等.后张体外预应力加固技术及其工程应用[J].建筑技术,2012(1):18-22.LIU Hang,GAO Huizong,YANG Xuezhong et al.Post-tensioned external prestressed reinforcement technology and its application[J].Journal of construction technology,2012(1):18-22(in Chinese)
    [9]刘航,杨学中.汶川大地震绵阳地区震害调查分析[J].建筑技术开发,2008(S1):189-193.LIU Hang,YANG Xuezhong.Analysis of disasters in Mianyang area in Wenchuan earthquake[J].Building Technique Development,2008(S1):189-193(in Chinese)
    [10]S.Chuang,Y.Zhuge,P.C.Mc Bean,Seismic retrofitting of unreinforced masonry walls by cable system[C]//13th World Conference on Earthquake Engineering,Vancouver,B.C.,Canada,August 1-6,2004
    [11]Najif Ismail,Peter Laursen,Jason M.Ingham,Out-of-plane testing of seismically retrofitted URM walls using posttensioning[C]//Proceedings of The AEES Conference,Newcastle,Australia,11-13 December 2009.
    [12]M.El Gawady,P.Lestuzzi,M.Badoux,A review of conventional seisnic retrofitting techniques for urm[C]//13th International Brick and Block Masonry Conference Amsterdam,July 4-7,2004.
    [13]Nebojsa Mojsilovic,Peter Marti.Load tests on post-tensioned masonry walls[J].TMS Journal,July 2000.