反演工程场地剪切波速剖面的简化剥层法
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
基于工程场地瑞利面波相速度主要受土层剪切波速控制,本文利用瑞利面波相速度对剪切波速的偏导数随土层深度变化的规律,结合地球物理勘探中的剥层法及工程场地勘探中的半波长法,提出了用面波相速资料及演工程场地剪切波速剖面的新方法,并用实测资料做了检验.
Based on the fact that in situ Rayleigh surface wave phase velocities are mainly controlled by shear wave velocities in soils and that the partial derivative of Rayleigh surface wave phase velocities with respect to shear wave velocities varies regularly according to the depth of soil, combining the stripping method used in geophysical exploration and the half wave length method used in engineering geological exploration, this paper puts forward a new method of using the data of surface wave phase velocities to inverse shear wave velocity of soil layers. The accuracy of the suggested method has been verified by the observed data in field shear wave velocity test.
引文
[1]朱介寿:《地震学中的计算方法》,地震出版社,1989年.
    [2]Nazarian,S.and K.H.Stoke:In Situ Shear Wave Velocities from Spectral Analysis of Surface Waves,8th EWCEE Vol.3,1984.
    [3]崔建文:工程场地剪切波速测量的表面波频谱分析法,国家地震局工程力学研究所硕士论文.1991年.
    [4]E.M.谢尔盖耶夫主编:《岩土工程地质研究方法手册》,地质出版社,1990年.
    [5]A.H.Harker:Elastic Waves in Solids,British Gas,1988.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心