地震现场建筑物安全性鉴定量化方法
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
针对房屋震损状态这一定性指标的评价问题,提出了国家标准GB 18208.2-2001《地震现场工作第二部分:建筑物安全鉴定》定量化方法,并引入了震损指数对房屋整体震损进行评价.通过大量房屋震损实例分析及经验总结,建立了房屋震损鉴定的数学评价模型.具体分析流程包括:确定地震现场安全性鉴定层次关系;确定底层震损评价系数;确定震损房屋各部位的权重值;划分震损等级;进行计算分析.通过对以往多次地震中大量房屋结构实例计算分析,并与其真实震损状态相对比,验证了本文的数学模型和计算方法的可靠性.
Aimed at the assessment of a qualitative index: earthquake damage condition of buildings,a quantitative method is proposed,and the earthquake damage exponential is introduced,which assesses the whole earthquake damage of building based on National Standard GB18208.2-2001: Post-earthquake Field Works,Part 2: Safety Assessment of Buildings.A mathematical assessment model for earthquake damage identification of buildings is developed through instance analysis and summarized experience of earthquake damage of buildings.In the analysis process,the hierarchy relationship of post-earthquake safety assessment was determined firstly,then the evaluation coefficient of bottom earthquake damage and weight values of different sites of earthquake damage of buildings were confirmed,and finally a calculation analysis was conducted after dividing the grades of earthquake damage.Through instance calculation analysis of many building structures in the past earthquake,the reliability of proposed mathematical model and calculation method was validated.
引文
[1]ELLINGWOOD B R,KINALI K.Quantifying and com-municating uncertainty in seismic risk assessment[J].Structural Safety,2008,31:179-187.
    [2]ELLINGWOOD B R,WEN Y K.Risk-benefit baseddesign decisions for low probability/high consequenceearthquake events in Mid-America[J].Program Struc-tural Engineering Material,2005,7(2):56-70.
    [3]欧进萍,张世海,刘晓燕,等.高层钢筋混凝土结构抗震选型的模糊专家系统[J].地震工程与工程振动,1997,17(2):209-213.
    [4]国家质量技术监督局.GB18208.2-2001地震现场工作第二部分:建筑物安全鉴定[S].北京:中国标准出版社,2001.
    [5]ABRAHAMSON N A,BOMMER J J.Probability anduncertainty in seismic hazard[J].Earthquake Spectra,2005,21(2):603-607.
    [6]王严,赵晓兰,宋佩如.层次分析法在评价医院感染管理质量中的应用[J].中国预防医学杂志,2006,7(4):267-269.
    [7]罗媛,周少华.多因子评价模型在客户分类中的应用[J].科技管理研究,2005,(7):146-153.
    [8]胡聿贤.地震工程学[M].北京:地震出版社,1988.
    [9]PORTER K A,KIREMIDJIAN A S,LEGRUE J S.As-sembly-based vulnerability of buildings and its use inperformance evaluation[J].Earthquake Spectra,2001,17(2):291-312.
    [10]WEN Y K,ELLINGWOOD B R,VENEZIANO D,etal.Uncertainty modeling in engineering(white paper)[R].Report No.FD-2,Mid-America EarthquakeEngineering Center.Urbana(IL):University of Illi-nois,2003.
    [11]孙柏涛,孙景江,张令欣,等.福建省晋江市城区地震灾害预测与信息管理系统研制[R].哈尔滨:中国地震局工程力学研究所,2004.
    [12]ESTEVA L,RUIZ S E.Seismic failure rates of multi-story frames[J].Structural Engineering,1989,115(2):268-283.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心