摘要
根据初步设计布置方案,对海甸峡面板堆石坝及其高趾墙的工作性态进行三维有限元计算研究,详细分析了高趾墙的变形、应力等工作性态,论证了高趾墙设计方案的合理性。
In the preliminary design stage,one scheme of Haidianxia Hydropower Station is that the concrete facing rockfill dam is parallelly arranged together with the concrete overflow gravity dam,in which a gravity high-toe wall with the height of nearly 50m is used,which is the highest one in China now. The stability and safety of the gravity high-toe wall is the key problem of the project. This paper performs a 3-D FEM calculation for the concrete facing rockfill dam and the gravity high-toe wall,analyzes the deformation and stress distribution of the gravity high-toe wall in detail,and researches the working behavior of gravity high-toe wall under design and check conditions. It is proved that the design scheme is reasonable and feasible.
引文
[1] 水利部.混凝土面板堆石坝设计规范[S].北京:中国水利水电出版社,1999.
    [2] 汤,陈洪天,吴曾谋,等.公伯峡水电站混凝土面板堆石坝设计[J].水力发电,2002(8):3438
    [3] 戴永志,顾淦臣.黄河公伯峡混凝土面板堆石坝三维非线性分析[J].红水河,2001,20(4):3741
    [4] 沈振中,迟世春,陈剑.混凝土面板堆石坝高趾墙动力性态计算研究[J].水电能源科学,2005,23(1):7376
    [5] 顾淦臣.土石坝地震工程[M].南京:河海大学出版社,1989.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心