连拱坝交叉模态综合法的完备性
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
对笔者提出的连拱坝动力特性计算的子结构交叉综合法的正确性进行了证明.利用证明子结构子模态向量组成的线性空间是完备的基础上,说明当交叉子结构中所取的截尾模态趋向于完备时,其结果等同于整体计算,并表明近似计算将收敛于正确的结果.
In this paper the validity of the cross modal synthesis model for modal analysis of multi-arch dams proposed by the author is demonstrated.It is demonstrated firstly that the linear space consisting of the submodal vectors of the substructures is complete.As the number of truncated submodal vectors of the substructures is increased to the full number,the calculation result will be equal to that of the global calculation.So it is also demonstrated that the approximation calculation will approach to the valid result.
引文
[1]曹楚生.连拱坝的横向地震动力分析商榷[J].中国水利,1957,(8):42-47.
    [2]Craig Jr,C-J Chang.A Review of Substructure Coupling Method for Dynamic Analysis[A].National Aeronautics andAdministration.Advanced in Engineering Science[C].1976,(Vo1 2),393-408.
    [3]王文亮,杜作润.结构振动与动态子结构方法[M].上海:复旦大学出版社,1985.
    [4]路观平.连拱坝动力特性计算的子结构交叉结合法[J].水利学报,1997,(2):45-51.
    [5]路观平,王晓泉.连拱坝的振动与抗震[J].水利水运科学研究,2000,(2):14-19.
    [6]路观平,王晓泉.连拱坝的动力特性及模态综合[J].应用力学学报,1997,14(增刊):34-37.
    [7]路观平,王晓泉,王雨苗,等.模态综合的交叉子结构方法[J].振动工程学报,2002,15(3):300-304.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心