宽频带地震计的快速标定
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
在满足一定测试精度的前提下,提高地震计标定的效率在地震计的批量生产中十分重要。讨论了宽频带地震计三点正弦波标定和阶跃标定,并将两种方法结合起来形成快速标定新方法,该方法具有一定的实用价值。
This paper discusses the three-frequency-point sine-wave calibration and step calibration and presents a new fast calibration method combining both of above calibration methods,it is pracitical.The fast calibration method has been applied in batch production of seismometers and raises work efficiency well.
引文
1蔡亚先,吕永清,周云耀,等.JCZ-1超宽频带地震计[J].地壳形变与地震,1995,15(3):1~8.1 Cai Yaxian,Lu Yongq ing and Zhou Yunyao,et al.JCZ-1very broadband se ismom eter[J].Crustal Deform ation andEarthquake,1995,15(3):1-8.(in Ch inese)
    2蔡亚先,吕永清,周云耀,等.CTS-1甚宽频带地震计[J].大地测量与地球动力学,2004,24(3):109~114.2 Cai Yaxian,Lu Yongq ing,Zhou Yunyao,et al.CTS-1 verybroadband se ismom eter[J].Journal of Geodesy and Geody-nam ics.2004,24(3):109-114.(in Ch inese)
    3胡寿松.自动控制原理(第四版)[M].北京:科学出版社,2001.3 Hu Shousong.Princ ip le of auto-contral(the 4 th ed ition)[M].Be ijing:Sc ience Press.2001.(in Ch inese)
    4周云耀,蔡亚先,吕永清,等.CT-1地震计传递函数测试仪的设计[J].大地测量与地球动力学,2002,22(3):117~121.4 Zhou Yunyao,Cai Yaxian,Lu Yongq ing,et al.Design ofCT-1 transfer function test system of se ismom eter[J].Jour-nal ofGeodesy and Geodynam ics,2002,22(3):117-121.(in Ch inese)
    5周云耀,吕永清.用相关法提高地震计相频特性测试精度[J].大地测量与地球动力学,2003,23(1):119~122.5 Zhou Yunyao and Lu Yongq ing.Improving test prec ision ofphase reponse of se ismom eter by using correlation techn ique[J].Journal of Geodesy and Geodynam ics,2003,23(1):119-122.(in Ch inese)
    6周云耀.甚宽频带地震计频域标定的噪声数据处理方法[J].大地测量与地球动力学,2004,24(1):121~126.6 Zhou Yunyao.A m ethod of noise data processing in frequen-cy dom ain calibration for Very B roadband Se ismom eter[J].Journal ofGeodesy and Geodynam ics,2004,24(1):121-126.(in Ch inese)
    7周云耀.超宽频带与甚宽频带地震计阶跃标定的加权动态拟合法[J].大地测量与地球动力学,2005,25(1):123~126.7 Zhou Yunyao.Dynam ic we ighted fitm ethord in step calibra-tion of u ltra-broadband and Very B roadband Se ismom eter[J].Journal of Geodesy and Geodynam ics,2005,25(1):123-126.(in Ch inese)
    8周云耀.地震计时域标定的噪声数据处理[J].大地测量与地球动力学,2004,24(4):123~127.8 Zhou Yunyao.Noise data processing in tim e dom ain calibra-tion of se ismom eter[J].Journal of Geodesy and Geodynam-ics,2004,24(4):123-127.(in Ch inese)
    9周云耀,蔡亚先.甚宽频带地震计频域标定的相关处理技术[J].武汉大学学报(信息科学版),2005,30(7):632~635.9 Zhou Yunyao and Cai Yaxian.Correlation processing tech-n iques in frequency-dom ain calibration for Very B roadbandSe ismom eter[J].Geom atics and Inform ation Sc ience ofW u-han Un iversity,2005,30(7):632-635.(in Ch inese)

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心