宝山湖水库堤坝缺陷分析及加固技术
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
宝山湖水库是宝钢唯一的原水供应地,结合地质条件对宝山湖水库堤坝产生缺陷原因进行了分析,提出加固的原则以及加固修复方案。介绍了包括施工方案,施工工艺和拆除护坡结构、回填水泥土、铺设级配碎石和土工膜复合防渗反滤系统、灌浆砌石、压密注浆等施工方法。结果表明,采取以上加固措施可行有效,达到了预期效果,保证了宝山湖水库的正常运行。
The reservoir locating at Baoshan Lake is the only supply water source for Baosteel Group.Combing with the geological condition,the authors analyze the defect causes of Baoshan lake reservoir’s dam,put forward strengthening rule and strengthening and repairing scheme.In this article,the authors mainly show the construction technology of dismantling slope protection,back-filling cement soil,laying out composite anti-seepage and anti-filter system of graded broken stone and geo-membrane,grouting masonry and compaction grouting,etc.The strengthening result shows that the strengthening measures are feasible to attain the expected effect which can assure the normal running of the reservoir.
引文
[1]张启岳.土石坝加固技术[M].北京:中国水利水电出版社,2000.
    [2]岩土力学与工程的理论与实践[M].杭州:浙江大学出版社,1992.
    [3]龚晓南.地基处理技术发展与展望[M].北京:中国水利水电出版社,2004.
    [4]上海市政工程设计研究院.宝钢水库北堤内坡修复工程方案设计报告[R].2009.
    [5]吴大军,詹天惠,奕怀东.碳纤维复合补强材料在竹溪河水库输水管加固工程中的应用[J].工业建筑,2008(S1):1051-1054.
    [6]严建武,吴洪刚,张永凯.黄河小浪底水库坝址区地震动参数的研究[J].工程抗震与加固改造,1988(1):