引文
[1]李术才,李树忱,张庆松,等.岩溶裂隙水与不良地质情况超前预报研究[J].岩石力学与工程学报,2007,26(2):217–225.(LIShucai,LI Shuchen,ZHANG Qingsong,et al.Forecast of karst-fractured groundwater and defective geological conditions[J].ChineseJournal of Rock Mechanics and Engineering,2007,26(2):217–225.(in Chinese))
[2]李术才,薛翊国,张庆松,等.高风险岩溶地区隧道施工地质灾害综合预报预警关键技术研究[J].岩石力学与工程学报,2008,27(7):1 297–1 307.(LI Shucai,XUE Yiguo,ZHANG Qingsong,et al.Key technology study on comprehensive prediction and early-warning of geological hazards during tunnel construction in high-riskkarst areas[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(7):1 297–1 307.(in Chinese))
[3]王梦恕.对岩溶地区隧道施工水文地质超前预报的意见[J].铁道勘查,2004,(1):7–9.(WANG Mengshu.Hydrologic and geologicalforecast of tunnel construction in the karst district[J].Railroad Survey,2004,(1):7–9.(in Chinese))
[4]王华,吴光,冯涛,等.渝怀线圆梁山隧道超前地质钻探预报技术应用研究[J].铁道建筑,2007,(2):36–38.(WANG Hua,WU Guang,FENG Tao,et al.Application and study on the advancedrilling geological prediction in Yuanliangshan Tunnel[J].RailwayEngineering,2007,(2):36–38.(in Chinese))
[5]刘志刚,刘秀峰.TSP(隧道地震勘探)在隧道隧洞超前预报中的应用与发展[J].岩石力学与工程学报,2003,22(8):1 399–1 402.(LIUZhigang,LIU Xiufeng.TSP application and development in tunneladvanced forecast[J].Chinese Journal of Rock Mechanics and Engineering,2003,22(8):1 399–1 402.(in Chinese))
[6]刘斌,李术才,李树忱,等.复信号分析技术在地质雷达预报岩溶裂隙水中的应用研究[J].岩土力学,2009,30(7):2 191–2 196.(LIU Bin,LI Shucai,LI Shuchen,et al.Application and study oncomplex signal analysis in the prediction of karst-fractured groundwater with GPR[J].Rock and Soil Mechanics,2009,30(7):2 191–2 196.(in Chinese))
[7]曲海峰,刘志刚,朱合华.隧道信息化施工中综合地质预报技术[J].岩石力学与工程学报,2006,25(6):1 246–1 251.(QU Haifeng,LIU Zhigang,ZHU Hehua.Technique of synthetic geologic predictionahead in tunnel informational construction[J].Chinese Journal of RockMechanics and Engineering,2006,25(6):1 246–1 251.(in Chinese))
[8]王锦山,王力,曹志刚,等.厦门海底隧道综合超前地质预报实践[J].岩石力学与工程学报,2007,26(11):2 309–2 317.(WANGJinshan,WANG Li,CAO Zhigang,et al.Practice on synthetic geologicalprediction ahead of construction of Xiamen subsea tunnel[J].ChineseJournal of Rock Mechanics and Engineering,2007,26(11):2 309–2 317.(in Chinese))
[9]李天斌,孟陆波,朱劲,等.隧道超前地质预报综合分析方法[J].岩石力学与工程学报,2009,28(12):2 429–2 436.(LI Tianbin,MENG Lubo,ZHU Jing,et al.Comprehensive analysis method foradvanced forecast of geology in tunnels[J].Chinese Journal of RockMechanics and Engineering,2009,28(12):2 429–2 436.(in Chinese))
[10]岳建华,刘树才.矿井直流电法勘探[M].徐州:中国矿业大学出版社,2000:5–15.(YUE Jianhua,LIU Shucai.Underground mineelectrical prospecting[M].Xuzhou:China University of Mining andTechnlogy Press,2000:5–15.(in Chinese))
[11]岳建华,李志聃.矿井直流电法勘探中的巷道影响[J].煤炭学报,1999,24(1):7–10.(YUE Jianhua,LI Zhidan.Roadway influence onelectrical prospecting in underground mine[J].Journal of China CoalSociety,1999,24(1):7–10.(in Chinese))
[12]李学军.煤矿井下定点源梯度法超前探测试验研究[J].煤田地质与勘探,1992,20(4):59–62.(LI Xuejun.Study and experiment onheading detecting by fixed electric source gradient method inunderground mine[J].Coal Geology and Exploration,1992,20(4):59–62.(in Chinese))
[13]程久龙,王玉和,于师建,等.巷道掘进中电阻率法超前探测原理与应用[J].煤田地质与勘探,2000,28(4):60–62.(CHENG Jiulong,WANG Yuhe,YU Shijian,et al.The principle and application ofadvance surveying in roadway excavation by resistivity method[J].Coal Geology and Exploration,2000,28(4):60–62.(in Chinese))
[14]黄俊革,阮百尧,王家林.坑道直流电阻率法超前探测的快速反演[J].地球物理学报,2007,50(2):619–624.(HUANG Junge,RUAN Baiyao,WANG Jialin.The fast inversion for advanceddetection using DC resistivity in tunnel[J].Chinese Journal of Geophysics,2007,50(2):619–624.(in Chinese))
[15]张平松,刘盛东,曹煜.坑道掘进立体电法超前预报技术研究[J].中国煤炭地质,2009,21(2):50–53.(ZHANG Pingsong,LIUShengdong,CAO Yu.A study on stereo electric method advance predictiontechnology in tunnel excavation[J].Coal Geology of China,2009,21(2):50–53.(in Chinese))
[16]强建科,阮百尧,周俊杰.三维坑道直流聚焦法超前探测的电极组合研究[J].地球物理学报,2010,53(3):695–699.(QIANG Jianke,RUAN Baiyao,ZHOU Junjie.Research on the array of electrode ofandvanced focus detection with 3D DC resistivity in tunnel[J].Chinese Journal of Geophysics,2010,53(3):695–699.(in Chinese))
[17]谢明魁,刘永炳.地下水探测仪二次时差法[J].铁道工程学报,1993,(2):58–60.(XIE Mingkui,LIU Yongbing.Groundwater detectorwith half-decay time difference method[J].Journal of RailwayEngineering Society,1993,(2):58–60.(in Chinese))
[18]黄俊革.三维电阻率/极化率有限元正演模拟与反演成像[博士学位论文][D].长沙:中南大学,2003.(HUANG Junge.3D resistivity/IPmodeling and inversion based on FEM[Ph.D.Thesis][D].Changsha:Central South University,2003.(in Chinese))
[19]王家映.地球物理反演理论[M].北京:高等教育出版社,2002:1–14.(WANG Jiaying.Inverse theory in geophysics[M].Beijing:HigherEducation Press,2002:1–14.(in Chinese))
[20]姚姚.地球物理反演基本理论与应用方法[M].武汉:中国地质大学出版社,2002:51–71.(YAO Yao.Basic theory and applicationsmethod in geophysics inversion[M].Wuhan:China University ofGeosciences Press,2002:51–71.(in Chinese))
[21]吴小平,徐果明.利用共轭梯度法的电阻率三维反演研究[J].地球物理学报,2000,43(3):420–426.(WU Xiaoping,XU Guoming.Study of 3D resistivity inversion using conjugate gradient method[J].Chinese Journal of Geophysics,2000,43(3):420–426.(in Chinese))