绥滨坳陷滨参1井地震地质层位标定及其地质意义
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
为有效解决地震解释中层位追踪的闭合,经岩芯、测井数据、速度资料、属性剖面、合成记录制作等分析,对滨参1井重新进行了地震地质层位的标定。与前人标定的结果比较,基底顶面T5反射时间由2 100 ms调整为1 843 ms;城子河组顶面T4-2的反射下调一个相位。依据本次标定结果新的解释方案,绥滨组+东荣组由原解释方案的全区分布改为局部分布,且向北有增厚趋势;对城子河组顶面埋深由1 692 m调整为2 246 m,城子河组厚度的计算也相应发生变化。
In order to solve efficiently the problem of tracking and closing horizons,the authors calibrated the seismic geological horizon in Bincan well 1 again by analyzing drilling core,logging data,velocity data,attributive profile,synthetic record,etc.Compared with the results calibrated previously,the reflection T_5 of the basement top is changed from 2 100 ms to 1 843 ms;reflection T_(4-2) of Chengzihe Formation top is declined for one seismic phase.According to the new calibration results,the distributions of Suibin Formation and Dongrong Formation are reconsidered as local in nature,but regional;and their thickness probably increased northward.The buried depth of the Chengzihe Formation top is changed in account from 1 692 m to 2 246 m,and correspondingly,the thickness of Chengzihe Formation is also changed in account.
引文
[1]陆基孟.地震勘探原理及资料解释[M].北京:石油工业出版社,1991:205-208.LU Ji-meng.Seismic exploration principle and interpreta-tion[M].Beijing:Petroleum Industry Press,1991:205-208.
    [2]贾庆军,肖希山,张忠义,等.三江盆地绥滨坳陷二维地震资料解释成果[R].大庆:大庆油田有限责任公司勘探分公司,2004.JIA Qing-jun,XIAO Xi-shan,ZHANG Zhong-yi,et al.2-D seismic materials interpretation of Suibin depressionin Sanjiang Basin[R].Daqing:Exploration Filiale ofDaqing Oilfield Limited Liability Company,2004.
    [3]唐振海,张亚金,赵玉珍.三江盆地绥滨坳陷石油地质特征[J].大庆石油地质与开发,2005,24(3):31-32.TANG Zhen-hai,ZHANG Ya-jin,ZHAO Yu-zhen.Petroleum geology of Suibin depression in Sanjiang Basin[J].Petroleum Geology&Oilfield Development inDaqing,2005,24(3):31-32.
    [4]马小刚,王东坡,薛林福,等.三江盆地绥滨坳陷构造特征及其与油气的关系[J].长春科技大学学报,2000,30(1):46-49.MA Xiao-gang,WANG Dong-po,XUE Lin-fu,et al.Tectonic characteristics and their relation to oil and gas ofSuibin depression in Sanjiang Basin[J].Journal ofChangchun University of Science and Technology,2000,30(1):46-49.
    [5]顾先觉,吴剑锋,祁红林,等.二维地震偏移剖面对比解释作图新方法[J].石油物探,2005,44(1):83-84.GU Xian-jue,WU Jian-feng,QI Hong-lin,et al.Anew method of interpreting and mapping on 2-D seismicmigration section[J].Geophysical Prospecting forPetroleum,2005,44(1):83-84.
    [6]蒋淑婷,廖林,贾斐,等.提高合成地震记录质量的方法研究[J].江汉石油学院学报,2003,25(增刊):42-43.JIANG Shu-ting,LIAO Lin,JIA Fei,et al.Methodfor improving the quality of synthetic seismogram[J].Acta of Jianghan Petroleum Institute,2003,25(Sup-pl.):42-43.
    [7]王章青,杨立战,林胜春.地震综合解释技术在地层超覆圈闭研究中的应用[J].江汉石油学院学报,2003,25(2):60-61.WANG Zhang-qing,YANG Li-zhan,LIN Sheng-chun.Application of integrated seismic interpretation techniquein studying stratigraphic overlap trap[J].Acta ofJianghan Petroleum Institute,2003,25(2):60-61.
    [8]Edwabd A B,Norman H F.油气圈闭勘探[M].刘德来,王永兴,薛良清,等译.北京:石油工业出版社,2002:467-470.Edward A B,Norman H F.Exploring for oil and gastraps[M].LIU De-lai,WANG Yong-xing,XUELiang-qing,et al.translated.Beijing:Petroleum Indus-try Press,2002:467-470.
    [9]何樵登.地震勘探原理和方法[M].北京:地质出版社,1986:348-356.HE Qiao-deng.Seismic prospecting principle and methods[M].Beijing:Geological Publishing House,1986:348-356.
    ①大庆油田勘探分公司.三江盆地绥滨坳陷二维地震资料解释成果.大庆:大庆油田勘探分公司,2004.
    ①大庆油田勘探分公司.三江盆地绥滨坳陷二维地震资料解释成果.大庆:大庆油田勘探分公司,2004.
    ①大庆油田勘探分公司.三江盆地绥滨坳陷二维地震资料解释成果.大庆:大庆油田勘探分公司,2004.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心