管道通过地震断裂带施工技术
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
西气东输二线管道工程西段第1、2A标段线路工程通过了两条地震断裂带,即喀什河断裂带和博阿断裂带,针对这两条断裂带的管道施工,从管材要求、防腐要求、环焊缝性能要求、管道抗震措施、管道抗震施工、管道线路工程抗震验收等方面进行了施工技术总结,可供类似工程借鉴。
The first and the 2A bidding sections of West Section of Second West to East Gas Pipeline Project pass through two seismic fault zones, i.e. Keshi River seismic fault zone and Boa seismic fault zone. The technical summary on the pipeline construction in these two seismic fault zones is presented in aspects of pipe material, anticorrosion and girth welding performance as well as pipeline aseismic measures, aseismic construction and engineering aseismic check before acceptance, which will provide useful experience for similar projects.
引文
[1]QSY GJX 0109-2008,西气东输二线管道工程线路工程施工技术规范[S].