昆明新机场航站楼多台大型塔式起重机安装与作业技术
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
昆明新机场航站楼施工中采用多台大型塔式起重机,首先介绍了超大建筑面积大规模塔式起重机平面布置方法,不同地基情况下塔式起重机基础设计及施工方法,引入塔式起重机施工程序与施工方法,并验算了基础的强度和抗倾覆稳定性,确定了多台塔式起重机作业时垂直交叉高度、水平交叉高度和顶升方案,最后讲述了多台塔式起重机作业的安全措施。
Large-scale multi-tower cranes are adopted in Kunming New Airport Terminal.First,authors introduced the layout method of the large-scale cranes in very large building areas,and basis design and construction methods of cranes in different conditions were put forward.Then,construction procedure and method of the tower cranes were introduced,the basis strength and anti-overturning stability were tested,the scheme of lift-up,the height of vertically crossed and level crossed were determined.At last,safety measures of the multi-tower cranes were presented.
引文
[1]中国建筑业协会建筑安全分会.JGJ59-99建筑施工安全检查标准[S].北京:中国标准出版社,2004.Safety Branch of China Construction Association Construction.JGJ59-99 Standard of construction safety inspection[S].Beijing:Standards Press of China,2004.(in Chinese)
    [2]建筑施工机械安全操作规程与故障排除实用手册[M].北京:地震出版社,2009.Safe operation rules of construction machinery or practicalitymanual about trouble shooting[M].Beijing:Earthquake Press,2009.(in Chinese)
    [3]李钰.建筑施工安全[M].北京:中国建筑工业出版社,2009.Li Yu.Safety of construction[M].Beijing:China Architecture&Building Press,2009.(in Chinese)

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心