前兆观测仪器入网方案研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
以厦门地震台为试点,在保留该台原"九五"通信模式的前提下,完成其"九五"前兆仪器无缝接入到"十五"前兆数据管理系统。实验结果显示该方案运行稳定、误码率低、完全兼容"九五"标准与"十五"规程。
Under retaining the original "Ninth Five Year Plan" communication mode,completing the "Ninth Five Year Plan" precursor instruments' access to the "Tenth Five Year Plan" precursory data management system at Xiamen seismostation.Experimental results show that the program is running stably with low error rate,fully compatible with "Ninth Five Year Plan" standard and with "Tenth Five Year Plan" regulation.
引文
1付子忠,等.地震前兆数字观测公用技术与台网[M].北京:地震出版社,2003.(Fu Zizhong,et al.Earthquake pre-cursor digital technology and the common observation stationnetwork[M].Beijing:Seismological Press,2003)
    2何案华,等.串口前兆仪器的因特网接入方案与配套软件开发[J].地震研究,2008,31(3):279-283.(He Anhua,et al.Solutions to access serial precursor equipments via in-ternet and corresponding software development[J].Seismo-logical Research,2008,31(3):279-283)
    3何案华,等.“九五”前兆仪器通讯软件设计[J].大地测量与地球动力学,2008,(3):123-128.(He Anhua,et al.Design of communication software of precusor instruments forNinth Five Year Plan[J].Geodesy and Geodynamics,2008,(3):123-128)
    4王军,等.“九五”前兆台站与“十五”前兆台网的整合研究[J].大地测量与地球动力学,2008,(4):125-130.(Wang Jun,et al.Research on integrating Ninth Five YearPlan precursor stations into Tenth Five Year Plan precursornetwork[J].Journal of Geodesy and Geodynamics,2008,(4):125-130)
    5赵刚,等.“九五”数字化地震前兆台站整体接入因特网的研究[J].地震地磁观测与研究,2007,28(1):103-108.(Zhao Gang,et al.On integrating digital earthquakeprecursor station of Ninth Five Year Plan into internet[J].Seismological and Geomagnetic Observation and Research,2007,28(1):103-108)
    6汪晓平,等.Visual C++网络通信协议分析与应用实现[M].北京:人民邮电出版社,2003.(Wang Xiaoping,etal.Visual C++network communication protocol analysisand application[M].Beijing:Post&Telecom Press,2003)

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心