石膏山水库拱坝应力计算和稳定分析
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
分别采用拱梁分载法(四向调整)和三维有限元法对石膏山混凝土拱坝进行了5种工况的应力计算分析。根据计算结果提出坝体封拱灌浆分三个区域:坝体高程1 119.0 m以下为一区,封拱温度为14.3℃;坝体高程1 119.0~1 130.0 m为二区,封拱温度为12℃;坝体高程1 130.0 m以上为三区,封拱温度为6.5℃。
Based on arch-cantilever method and 3D finite element method,the stress of Shigaoshan concrete arch dam was analyzed under 5 conditions.According to the calculation results,the dam body is divided into 3 zones on the basis of closing arch for grouting: the dam body under the elevation of 1119.0m is zone 1,the joint closure temperature is 14.3℃;the elevation of the dam body between 1119.0 to1130.0 meters was zone 2,the joint closure temperature is 12℃;the dam body above the elevation 1130.0m is zone 3,the joint closure temperature is 6.5℃.
引文
[1]SL252-2000.水利水电工程等别划分及洪水标准[S].北京:中国水利水电出版社,2000.
    [2]山西省灵石县石膏山水库工程可选择性研究报告[R].山西省水利水电勘测设计研究院,2005.
    [3]GB50288-99.灌溉与排水工程规范[S].北京:中国标准出版社,1999.
    [4]山西省灵石县石膏山水库工程初步设计阶段地质勘察报告[R].山西省水利水电勘测设计研究院,2006.
    [5]GB18306-2001.中国地震动参数区划图[S].北京:中国标准出版社,2001.
    [6]朱伯芳,高季章,陈祖煜.拱坝设计与研究[M].北京:中国水利水电出版社,2002.12.
    [7]李瓒,陈兴华,郑建波,等.混凝土拱坝设计[M].北京:中国电力出版社,2000.
    [8]李守义,陈尧隆.拱坝初参数分析法[J].水利学报,1996,27(3):30-35.
    [9]SL282-2003.混凝土拱坝设计规范[S].北京:中国水利水电出版社,2003.
    [10]SL203-97.水工建筑物抗震设计规范[S].北京:中国水利水电出版社,1997.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心