引文
[1] 刘松.矿山法修建海底隧道最小埋深的探讨[J].隧道建设,2003,23(3) :4-6. LIU Song.Discussion on minimum cover depth of constructing subsea tunnel using blasting method[J].Tunnel Construction,2003,23(3) :4-6.
[2] 刘树年,范鹏.水底隧道钻爆法施工快速掘进技术初探[J].西部探矿工程,2003,86:103-105. LIU Shu-nian,FAN Peng.Research on fast driving technology of submerged tunnel using blasting method[J].West-China Exploration Engineering,2003,86: 103-105.
[3] 许锡宾,赵明阶,荣耀.公路隧道爆破掘进震动效应研究[J].水运工程,2004,368(9) :74-78. XU Xi-bin,ZHAO Ming-jie,RONG Yao.Vibration effect of blasting and driving of road tunnel[J].Port and Waterway Engineering,2004,368(9) : 74-78.
[4] 王明年,潘晓马,张成满,等.邻近隧道爆破震动响应研究[J].岩土力学,2004,25(3) :412-414. WANG Ming-nian,PAN Xiao-ma,ZHANG Cheng-man,et al.Study of blasting vibration influence on close-spaced tunnel[J].Rock and Soil Mechanics,2004,25(3) :412-414.
[5] 国胜兵,王明洋,赵跃堂,等.爆炸地震波作用下地下结构动力响应数值分析[J].世界地震工程,2004,20(4) :137-142. GUO Sheng-bing,WANG Ming-yang,ZHAO Yue-tang,et al.Dynamic numerical analysis of underground structures under action of explosion seismic wave[J].World Earthquake Engineering,2004,20(4) :137-142.
[6] X B Qiu,S C Li,W Z Chen.Numerical analysis of rock cover thickness of subsea tunnel[J].Tunnelling and Underground Space Technology,2004,19:426.
[7] Chengqing Wua,Yong Lu,Hong Hao.Numerical prediction of blast-induced stress wave from large-scale underground explosion[J].International Journal for Numerical and Analytical Methods in Geomechanics,2004,28:93-109.
[8] 李飞,陈卫忠,李术才,等.高速公路浅埋大跨度双跨连拱隧道爆破振动影响研究.岩石力学与工程学报[J].2004,23(增2) :4744-4748. LI Fei,CHEN Wei-zhong,LI Shu-cai et al.Study of effects of blast on shallow large-span double-linked-arch tunnel of expressway[J].Chinese Journal of Rock Mechanics and Engineering,2004,23(supp2) :4744-4748.
[9] 闫长斌,徐国元,李夕兵.爆破震动对采空区稳定性影响的 FLAC~(3D)分析[J].岩石力学与工程学报,2005,24(16) :2894-2899. YAN Chang-bin,XU Guo-yuan,LI Xi-bing.Stability analysis of mined-out areas influenced by blasting vibration with FLAC3D[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(16) :2894-2899.
[10] 王廷武,刘清泉,杨永琦,等.地面与地下工程控制爆破[M].北京:煤炭工业出版社,1990.
[11] 周听清.爆炸动力学及其应用[M].合肥:中国科学技术大学出版社,2001.
[12] 齐景岳,刘正雄,张儒林,等.隧道爆破现代技术[M].北京:中国铁道出版社,1995.
[13] Itasca Consulting Group,Inc.FLAC~(3D)Fast Lagrangian Analysis of Continua in 3 Dimension,Version 2. 0,User's manual[M].USA:Itasca Consulting Group,Inc.,1997.
[14] 姚勇,何川,晏启祥,等.董家山隧道小净距段爆破控制的数值模拟[J].岩土力学,2004,25(增):501-506. YAO Yong,HE Chuan,YAN Qi-xiang,et al.Numerical simulation of blasting control for small clear distance zone of Dongjiashan tunnel[J].Rock and Soil Mechanics,2004,25(Supp):501-506.
[15] 郭建群,张继春,许海亮,等.人和场隧道掘进爆破的地震效应试验研究[J].中国铁道科学,2003,24(4) :92-95. GUO Jian-qun,ZHANG Ji-chun,XU Hai-liang,et al.Seismic effects on drive blasting in Renhechang tunnel[J].China Railway Science,2003,24(4) :92-95.