碎石桩加固铁路路堤液化地基孔压变化的模型试验研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
以玉蒙铁路碎石桩加固处理路堤液化地基为工程背景,采用水平振动模拟地震荷载进行了碎石桩复合地基路基的振动台模型试验,试验测试了不同位置的孔压,对孔压的时程、分布特点和孔压比的变化进行了分析。水平加速度为0.3 g时,路堤坡脚以外地基产生液化,而路堤范围内未出现液化。采用碎石桩复合地基加固铁路液化地基时,需适当加宽加固地基的宽度。
As the case of the liquefied foundation consolidated with gravel pile along Yuxi-Mengzi Railway,shaking table model test for the subgrade with gravel pile composite foundation is carried out through simulating seismic load by horizontal vibration,in which the pore pressures at different positions are tested as well as the time interval,distribution characteristics and change of pore pressure ratio are analyzed.When the horizontal acceleration is 0.3g,the foundation outside the toe of the embankment is liquefied while that inside the range of embankment is not.Where liquefied foundation of railway is consolidated with gravel pile composite foundation,the width of the foundation needs to be widened and reinforced.
引文
[1]谢定义.土动力学[M].西安:西安交通大学出版社,1988.
    [2]谷海娇.振冲碎石桩在软土地基加固中的应用[J].路基工程,2010(2):189-190.
    [3]何广讷.振冲碎石桩复合地基[M].北京:人民交通出版社,2001.
    [4]南京水利科学研究院.软基加固新技术——振动水冲法[M].北京:水利水电出版社,1986.
    [5]郑建国.碎石桩复合地基液化判别方法的探讨[J].工程勘察,1999(2):5-7.
    [6]Tokimatsu K.,Yoshimi,Y.Effects of vertical drains of thebearing capacityof saturated sand during earthquakes[C].Proceedings of InternationalConference of Engineering for Protection from Natural Disasters.Bangkok:1980:643-655.
    [7]Sasaki Y,TaniguchiE.Shaking table tests on gravel drains topreventliquefaction of sand deposits[J].Soils and Foundations,1982,22(3):1-14.
    [8]王士风,王余庆.用砾石排水桩防止砂基液化的效果.地基与工业建筑抗震[C].北京:地震出版社,1984.