大跨度维修机库弹塑性地震反应分析
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
对某大跨维修机库进行了7度设防烈度不同强震水准下的弹塑性时程反应分析。结果表明:中震作用下,结构总地震作用及柱顶位移的弹塑性时程分析结果与弹性分析结果接近,仅个别构件开始出现塑性铰,结构总体基本处于弹性工作状态;大震作用下,机库后柱列各柱等构件出现塑性铰,其中,有个别构件塑性铰进入IO-LS阶段,其余均处于B-IO阶段;结构在大震的弹塑性工作阶段,仍有较好的整体刚度和承载能力,处于可修状态,柱顶最大位移角远小于其限值。
Elasto-plastic response time-history analyses of a long-span hangar structure were performed for differe it levels of earthquake inputs based on the seismic fortification intensity of 7.For the moderate earthquake input,the to al seismic loads and lateral drifts of the hangar from elasto-plastic response analysis are close to those from elastic analysis and,as a whole,the structure behaves roughly elastically.For the rare major earthquake input,the structure beha(?)es elastoplastically. Plastic hinges are formed in the supporting columns at the back of the hangar and a small number of other elements,in which very few have reached the IO-LS phase and the rest(majority) remain in the B-IO phase.The maximum drift angle of supporting columns is much smaller than the limit.The overall stiffness and bearing capacity of the structure are adequate in such a major earthquake.
引文
[1]GB50011-2001建筑抗震设计规范[S].北京:中国建筑工业出版社,2001.
    [2]钱稼茹,张微敬.北京A380机库结构地震反应分析[J].土木工程学报,2008,Vol.2:9-15.
    [3]北京金土木软件技术公司,中国建筑设计研究院,SAP2000中文版使用指南[M]..北京:人民交通出版社,2006.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心