关于工程地震实践若干问题
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
本文介绍和讨论了有关工程地震实践中的某些成果和问题:(1)考虑近源地震动饱和的衰减场模式及其转换;(2)核电厂厂址设计基准地面运动和不同核法规对人工设计时程合成的技术要求对比;(3)水利水电工程场地地震安全性评价;(4)以金沙江中下游地区为例介绍地震设防区划和设防区划图系;(5)从科学性和工程可接受性,以工程法规为基础提出工程活动断裂的定义、断裂活动性工程分类和地震断错形变工程评价。
Some problemss and study results in engineering earthquake practice was discussed in the paper. They are the attenuation of relationship of near source ground motion with saturation and derivative model of near source ground motion saturation with regard to the rupture dimension of source dislocation and the attenuation field of earthquake intensities in China continent, the characteristics of design basis ground motion and the synthesis of design ground motion time history for the Nuclear Power Plant, zoning of earthquake resistance level, taking the middle lower reaches of Jinshajiang River for example, the engineering active fault, and the evaluation of surface dislocation caused by earthquake.
引文
[1]蒋溥等.1993.工程地震学概论.北京:地震出版社.[2]蒋溥等.1989.地震小区划概论.北京:地震出版社.[3]胡聿贤.1988.地震工程学.北京:地震出版社.[4]Campbel,K.W.1981.Near-Sourceatenuationofpeakhorizontalacceleration,BSSA.vol.71,No.6,PP.2039~2070.[5]Housner,G.W.,1947.haracteristiesofstrongmotionearthquakesBSSA,Vo1.37,No.1,PP.19~31.[6]蒋溥等.1991.工程地震动时程合成与模拟.北京:地震出版社.[7]国家地震局,1990.中国地震烈度区划图,1:4000000,说明书,地震出版社,北京。[8]中华人民共和国原城乡建设环境保护部.1989.建筑抗震设计规范,GBJ11-89,北京:中国建筑工业出版社.[9]国家技术监督局,中华人民共和国建设部联合发布.1995.岩土工程勘察规范.北京:中国建筑工业出版社.[10]邓起东等.1992.地震地表破裂参数与震级关系的研究.活动断裂研究理论与应用.北京:地震出版社

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心