超前地质预报在歌乐山隧道施工中的应用
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
隧道在施工中不可避免地会遇到诸如溶洞、突水、坍塌等常见的地质灾害,为了将地质灾害影响程度降到最低,施工前进行超前地质预报是十分必要的。详细介绍了TSP超前预测预报方法的原理,并以歌乐山隧道为例子,针对该隧道复杂的地质条件,施工过程中采用超前预测预报和红外线探测技术相结合,成功地预报了掌子面前方的地质信息以及隧道涌水情况,有效地指导了该隧道的安全施工。
The geological disaster,such as cave of karst,rushing water and collapse often occur in tunnel excavation.The forecast geological prediction is imperative before tunnel excavation to minimize geological disaster.Prediction and forecast technique as the further realization and supplement of tunnel prospect is important to subtract and prevent hazard.The TSP method was introduced,the external water pressure on lining and calculate model of line structure in tunnel is analyzed.The thesis cites Geleshan Tunnel,as an example,though the geologic term is complicated for abundant water in tunnel,the advanced geologic prediction and infrared ray methods are adopted in the tunnel construction,and are used to forecast the geologic information in tunnel facing frontage and rushing water in tunnel successfully.The forecast results are effective and guide the tunnel construction safety.
引文
[1]赵永贵,刘浩,孙宇.隧道地质超前预报研究进展[J].地球物理学进展,2003,18(3):460-464.
    [2]李志祥,何振起,刘国伍.TSP-203在大文坪隧道超前预报中的应用[J].地球物理学进展,2005,20(2):465-468.
    [3]李忠.提高TSP超前预报系统距离的技术措施的研究[J].岩石力学与工程学报,2003,22(3):472-475.
    [4]吴俊.地质雷达在公路隧道短期地质超前预报中的应用[J].岩土力学,2003,24(增1):154-157.
    [5]刘志刚.TSP在隧道隧洞超前预报中的应用与发展[J].岩石力学与工程学报,2003,22(8):1399-1402.
    [6]常旭,刘伊克,桂志先.反射地震零偏移距逆时偏移方法用于隧道超前预报[J].地球物理学报,2006,49(5):1482-1488.
    [7]肖书安,吴世林.复杂地质条件下的隧道地质超前探测技术[J].工程地球物理学报,2004,1(2):63-69.
    [8]刘秀峰,刘志刚.岩溶地质超前预报方法研究[J].石家庄铁道学院学报,2003,16(2):71-73.
    [9]宋先海,顾汉明,肖柏勋.我国隧道地质超前预报技术评述[J].地球物理学进展,2006,21(2):605-613.
    [10]戴前伟,何刚,冯德.TSP在隧道超前预报中的应用[J].地球物理学进展,2005,20(2):460-464.
    [11]何刚,沙椿,丁陈奉.TSP-203系统数据采集的改进方案[J].地球物理学进展,2006,21(4):1332-1337.
    [12]李小红.渝怀铁路歌乐山隧道岩溶富水区施工技术研究[D].西南交通大学硕士学位论文.2005.
    [13]陈璋,陈光明,程久胜.注浆技术在龙潭特长公路隧道中的应用[J].重庆交通学院学报,2005,24(6):36-40.