沥青混凝土心墙坝防渗墙材料配比优化
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
采用Duncan-Chang非线性模型对下坂地深覆盖层沥青混凝土心墙坝进行了三维有限元分析,并着重对防渗墙的应力变形进行了分析研究,针对施工过程中防渗墙九种不同的材料级配方案,给出了大坝竣工期、水库蓄水期防渗墙应力和位移随墙体参数变化的规律;优化选择合适的墙体材料配比,为防渗墙墙体的选择提供了理论依据。
The Duncan-Chang nonlinear constitutive model is used to carry out a 3-D finite element analysis for the Xiabandi asphalt concrete core rockfill dam with deep overburden(147.95m).In the study,the characteristics of stress and displacement in the seepage prevention wall with deep overburden were analyzed, and the rule of stress and displacement change in the seepage prevention wall during engineering completion and water impounding operation period according to eight kinds of characteristic parameters change were given.As well,the paper provided reference for material selection of the seepage prevention wall.
引文
[1]顾淦臣.土石坝地震工程[M].天津:河海大学出版社,1989.
    [2]李永红,王晓东.冶勒沥青混凝土心墙堆石坝抗震设计[J].水电站设计,2004,20(2):40-45.
    [3]郦能惠,米占宽.冶勒水电站超深覆盖层防渗墙应力变形性状的数值分析[J].水利水运工程学报,2004(1):18-23.
    [4]王斌贝,张波.下板地堆石坝深覆盖层沥青混凝土防渗心墙应力应变分析[J].大坝与安全,2008(6):44-47.
    [5]SEDAT T.Treatment of the seepage problems at the KalecikDam(Turkey)[J].Engineering Geology,2003,68(3-4):159-169.