引文
[1]Liao F Y,Han L H,Tao Z.Seismic behaviour of circularCFST columns and RC shear wall mixed structures:Experiments[J].Journal of Constructional Steel Research,2009,65(8-9):1582-1596.
[2]曹万林,王敏,王绍合,等.高轴压比下钢管混凝土边框组合剪力墙抗震性能试验研究[J].地震工程与工程振动,2008,28(1):85-90.CAO Wan-lin,WANG Min,WANG Shao-he,et al.Seismicbehavior research on composite shear wall with concrete filledsteel tube columns in high axial-load ratio[J].Journal ofEarthquake Engineering and Engineering Vibration,2008,28(1):85-90.
[3]王敏,曹万林,张建伟,等.不同轴压比下钢管混凝土边框组合剪力墙抗震性能研究[J].世界地震工程,2008,24(2):32-36.WANG Min,CAO Wan-lin,ZHANG Jian-wei,et al.Seismic behavior research of composite shear wall withconcrete filled steel tube columns for different axial-load ratios[J].World Earthquake Engineering,2008,24(2):32-36.
[4]韩林海,陶忠,王文达.现代组合结构和混合结构-试验、理论和方法[M].北京:科学出版社,2009.
[5]李毅,王文达,郑建忠.钢管混凝土框架-组合剪力墙结构抗震性能试验研究[J].哈尔滨工业大学学报,2012,44(增刊1):289-293.LI Yi,WANG Wen-da,ZHENG Jian-zhong,Experimentalresearch on seismic behavior of concrete-filled steel tubularframe and composite shear wall structure[J].Journal ofHarbin Institute of Technology,2012,44(Sup.1):289-293.
[6]夏汉强,刘嘉祥.矩形钢管混凝土柱带框剪力墙的应用及受力分析[J].建筑结构,2005,35(1):16-18.XIA Han-qiang,LIU Jia-xiang.Application and structuralanalysis of shear wall connected with rectangular concrete-filled steel tube columns[J].Building Structure,2005,35(1):16-18.
[7]王文达,韩林海.钢管混凝土柱-钢梁平面框架的滞回关系[J].清华大学学报(自然科学版),2009,49(12):1934-1938.WANG Wen-da,HAN Lin-hai.Hysteresis relationship inconcrete filled steel tubular columns and steel beam planarframes[J].Journal of Tsinghua University(Science andTechnology),2009,49(12):1934-1938.
[8]Zhong J X.Model-based simulation of reinforced concreteplane stress structures:Ph.D.thesis[D].University ofHouston,American,2005.
[9]韩小雷,陈学伟,戴金华,等.基于OpenSees的剪力墙低周往复试验的数值分析[J].华南理工大学学报(自然科学版),2008,36(12):7-12.HAN Xiao-lei,CHEN Xue-wei,DAI Jin-hua,et al.Numerical Analysis for low-cyclic loading test of shear wallsbased on OpenSEES[J].Journal of South China University ofTechnology(Natural Science Edition),2008,36(12):7-12.
[10]杨红,张睿,臧登科,等.纤维模型中非线性剪切效应的模拟方法及校核[J].四川大学学报(工程科学版),2011,43(1):8-16.YANG Hong,ZHANG Rui,ZANG Deng-ke,et al.Fibermodel based nonlinear shear effect modeling method and itscalibration[J].Journal of Sichuan University(EngineeringScience Edition),2011,43(1):8-16.
[11]Mazzoni S,McKenna F,Scott M H,et al.Open sees usersmanual[R].PEER,University of California,Berkeley,2009.
[12]Attard M M,Setunge S.Stress-strain relationship of confinedand unconfined concrete[J].ACI Materials Journal,1996,93(5):432-442.
[13]杨亚彬,张建伟,曹万林,等.圆钢管混凝土边框剪力墙抗震性能试验研究[J].世界地震工程,2011,27(1):78-82.YANG Ya-bin,ZHANG Jian-wei,CAO Wan-lin,et al.Study on seismic performance of shear wall with concretefilled round steel tube columns[J].World EarthquakeEngineering,2011,27(1):78-82.
[14]钱稼茹,江枣,纪晓东.高轴压比钢管混凝土剪力墙抗震性能试验研究[J].建筑结构学报,2010,31(7):40-48.QIAN Jia-ru,JIANG Zao,JI Xiao-dong.Experimental studyon seismic behavior of steel tube-reinforced concretecomposite shear walls with high axial compressive load ratio[J].Journal of Building Structures,2010,31(7):40-48.