引文
[1]李国强,孙飞飞,沈祖炎.强震下钢框架梁柱焊接连接的断裂行为[J].建筑结构学报,1998,19(3):26-29.
[2]宋振森,顾强,郭兵.刚性钢框架梁柱连接试验研究[J].建筑结构学报,2001,22(2):53-57.
[3]李杰,张玉凤,霍立兴,王东坡.梁柱焊接接接头的模拟地震循环荷载作用下的有限元分析[J],焊接学报,2002,10:15-18.
[4]EngelhardtM D and SabotT A.Seism ic-resistant steelmom ent connections:developm ent since the l994 Northridge Earthquake[R].ConstructionResearch Commun icatons L im ited,1997,ISSN,1365-055.
[5]Lu L-W,R icles JM,Mao C,F isher JW.C ritical issues in ach ieving ductile behaviour ofwelded mom ent connections[J].Journal ofConstruc-tional Steel Research,2000,55,325-341.
[6]Anderson J C,Duan J,X iao Y and Maran ian P.Cyclic testing ofmom ent connections upgraded w ith weld overlays[J].Journal of Structural En-gineering,2002,128(4):509-516.
[7]田中淳夫.梁端混合连接[J],建筑技术(日),1994,9.
[8]Lee K,Foutch D A.Performance evaluation of new steel fram e bu ild ings for seism ic loads[J].Earthquake Engineering and StructuralDynam ics,2002,31,653-670.
[9]Mah in S A.Lessons from damage to steel bu ild ings during the Northridge earthquake[J].Engineering Structures,1997,19(2):261-270.
[10]GatesW E,Morden M,Professional structural engineering experience related to welded steel mom ent fram e follow ing the northridge earthquake[J].the Structural D esign of Tall Bu ild ing,1996,5(1):29-44.
[11]陈富生,邱国桦,范重.高层建筑钢结构设计[M].北京:中国建筑工业出版社,2000.4.
[12]刘洪波.空间钢框架结构的简化柱梁模型及其弹塑性动力分析[D].2002.
[13]刘其祥,蔡益燕,朱知信,顾泰昌.多高层房屋钢结构梁柱刚性连接节点的抗震设计[J].建筑结构,2001,32(8):9-12.
[14]刘其祥.多高层房屋钢结构梁柱刚性连接节点的设计建议.建筑结构.2003,33(9):3-7.
[15]W h ittaker A,G ilan i A,Bertero V,Evaluation of pre-Northridge steel mom ent-resisting fram e joints[J].The Structural D esign of Tall Bu ild-ings,1998,7,263-288.
[16]R igh in iotis T D,Om er E,E lghazou li A Y.A simplified crack model for weld fracture in steelmom ent connections[J].Engineering Structures.2002,24(12):1133-1140.
[17]姚国春,霍立兴,张玉凤,荆洪阳,杨新岐.带人工裂缝的焊接钢结构梁柱节点有限元应力分析[J].机械强度,2001,23(1):47-49.
[18]姚国春,霍立兴,张玉凤,杨新岐.焊接钢结构梁柱节点地震下的断裂行为研究[J].钢结构,2000,4:25-27.
[19]Popov E P,Yang T-S,Chang S-P.D esign of steelMRF connections before and after 1994 Northridge earthquake[J],Engineering Structures.1998,20(12):1030-1038.