应用电阻率层析成像探测采空区、斜风井巷道稳定性计算
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
采用电阻率层析成像二维测量的方法,对河南省义马市义马煤业(集团)2×50MW跃进电厂采空区和斜风井巷道进行了勘探,获取了采空区、影响区以及斜风井巷道的准确位置。说明,电阻率层析成像二维测量的方法在采空区和斜风井巷道的探测中是行之有效的;煤矿采空区和斜风井巷道内在没有水体存在时,电阻率层析成像二维测量成果图中反映的一般都是高阻异常封闭圈。如果有水体存在,其异常则表现为低阻异常封闭圈。同时,根据该区的地质构造、地层结构、地面建筑的有关参数等资料,分析和计算了斜风井巷道的稳定性和安全性。结果表明,①主控楼受斜风井巷道的影响较大,是不稳定的,也是不安全的,必须采取妥善的加固措施;②主厂房不受斜风井巷道的影响,是稳定的,可以不采取加固措施。
The excavated-empty-area and the inclined shaft trunnels were surveyed with Z-D resistivity tomography in YueJin Power plant with 2×50MW/year of Yima Coal Mining Industry Group in Henan Province. The places of the excavated-empty-area and it’s influence range, and the inclined shaft tunnels were determined. Z-D images of the resistivity tomography show generally anomalous high-resistivity closed circles, which suggests that there is no water in the excavated-empty-area and in the inclined shaft tunnels. Should there be water, the anomaly would manifest as low-resistivity closed circles. Moreover the stability and safety of the inclined shaft tunnels are analyzed and calculated based on the parameters of geological structures, stratigraphic configuration and ground buildings. Our studied results indicate that ① the inclined shaft tunnels have strong influence on the main monitored-control building, and the building is instable and unsafe must be reinforced; ② the main workshop does not be affected and is stable.
引文
[1]谢忠球、温佩琳、喻振华.提高高密度电阻率成像分辨率的数据处理技术[C].湖南省地球物理论丛(2001)中南大学出版社,2001.
    [2]李清林.郑州市区基底起伏及隐伏断层的探测研究,构造地质学-岩石圈动力学研究进展[M].北京:地震出版社,1999.
    [3]蔡美峰.岩石力学与工程[M].北京:科学出版社,2002.
    [4]《工程地质手册》编写委员会.工程地质手册(第三版)[M]。北京:中国建筑工程出版社,1992.
    [5]刘星辉、苏国友.邵东县石膏矿采空区地面稳定性评价及地质灾害防治措施[J].矿业工程,2004,24(1):20-23.
    [6]李清林等.地下人防工程地面勘测定位的三种方法[J].河南地质,1996,14(3):219-224.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心