土钉支护现场测试及三维数值模拟分析
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
在进行土钉轴力和边坡位移测试的基础上 ,进行了土钉支护的三维数值模拟研究 ,对边坡位移、土钉轴力、塑性区分布等分别作了较为深入的探讨 ,认识到土钉与土体相互作用形成了一个完整的支护体系 ;基坑失稳破坏并非传统意义上的土体和土钉的破坏 ,而是土钉支护体系的整体性破坏 ;土钉支护体系的形成正是通过土钉的分担作用、应力传递与扩散作用来实现的 ,这是土钉支护作用的实质
Based on soil nail axial force and slope displacement testing, a 3-D soil nailing support numerical model is constructed and the slope displacement, soil nail axial force, plastic displacement are deeply discussed in this paper.Most meaningful conclusions are drawn: soil nail and soil mass form a whole supporting system through their interaction; foundation pit in stability is not due to soil mass failure or soil nail failure, but is due to the instability of whole supporting system; the supporting system is formed by soil nail bearing partial force and stress transferring and diffusing. These are the essence of the soil nail support.
引文
[1] 秦四清,王建党著.土钉支护机理与优化设计[M ].北京:地质出版社,1999.QinSiqing,etal..Boltingmechanismandoptimaldesignofsoilnailing.Beijing:GeologicalPublishingHouse,1999.
    [2] 秦四清等.深基坑工程优化设计[M ].北京:地震出版社,1998.QinSiqing,etal..Optimaldesignofdeepfoundationpitengi neering.Beijing:SeismicPress,1995.
    [3] 张明聚,郭忠贤.土钉支护工作性能的现场测试研究[J].岩土工程学报,2001,23(3):319~323.Zhangmingju,etal..Researchonbehaviorsofsoilnailingbyfieldtest.JournalofGeotechnicalEngineering,2001,23(3):319~323.
    [4] 贾洪.钉土相互作用的剪滞力理论分析[J].工程地质学报,2002,10(2):156~159.Jiahong.Sheartheoryanalysisonsoil-nailinteraction.Beijing:JournalofEngineeringGeology,2002,10(2):156~159

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心