首钢孟家冲尾矿坝渗流稳定分析
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
针对孟家冲尾矿库坝面出现的渗水现象,对坝体的渗流以及稳定进行计算分析。计算结果表明,由于堆积坝的不断升高,导致坝体浸润线抬高,安全稳定系数降低,从而将造成坝体失稳,出现溃坝事故。为消除隐患,提出采用辐射井排渗的设计方案,并对该方案的可行性进行计算分析。
Aimed at the seepage phenomenon of Mengjiachong tailings dam of Shougang,an analysis and calculation was made on the seepage and stability of this dam.The result indicated that,due to the continual rising of the stacking dam,the saturation line also rose and the safety stability coefficient decreased,which would cause the instability and break of the dam.In order to eliminate such hidden hazards,a drainage method using radiation wells was presented and the feasibility of this method was verified.
引文
[1]祝玉学.关于尾矿库工程中几个问题的讨论[J].金属矿山,1998(10):7-10
    [2]王来贵.尾矿库灾害及其工程整治[J].中国地质灾害与防治学报,2003,14(3):76-80
    [3]腾志国.关于尾矿坝地震稳定性的分析及评价[J].河北冶金,2003(1):16-17
    [4]李作章,徐日升.尾矿库安全技术[M].北京:航空工业出版社,1996:83
    [5]徐桂兴.尾矿坝的渗流及其影响[A].冶金矿山尾矿库技术交流会文集[C],1987:7-13
    [6]洪石笙.尾矿坝渗透稳定性分析[A].冶金矿山尾矿库技术交流会文集[C],1987:78-86
    [7]赵晖.尾矿工程[M].北京:冶金工业出版社,1986:170-195
    [8]田文旗,薛剑光.尾矿库安全技术及管理[M].北京:煤炭工业出版社,2006
    [9]钱家欢,殷宗泽.土工原理与计算[M].北京:中国水利水电出版社,2003:155-166,304-307
    [10]中国人民共和国建设部.选矿厂尾矿库设计规范[S].ZBJ—1990,1990

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心