隧道超前预报的综合物探方法与效果
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
地球物理勘探方法应用于隧道掘进中的超前预报,具有快捷、准确的特点。该文以某高速公路隧道段的超前预报为实例,通过使用地震超前预报(TSP203)方法和瞬变电磁方法(TEM)综合探测,及时、详细、准确地了解隧道的地质情况,为施工单位及时排除工程中的地质隐患,合理安排施工进度,确保顺利开挖提供了科学依据。
The geophysical exploration method has the characters of quickness and accuracy in advanced prediction of tunnel construction.Take the tunnel section of an expressway for example,the tunnel geological features are accurately found out in time,in detail by using tunnel seismic prediction(TSP) method and transient electromagnetic(TEM) method exploration.It can get rid of the potential hidden danger of engineering in time and arrange reasonable construction process and ensure successful excavation,and it provides the scientific basis for the tunnel project.
引文
1雷宛,肖宏跃.工程与环境物探教程.北京:地质出版社,2006
    2肖宏跃,雷宛.地电学教程.北京:地质出版社,2008
    3刘志刚.隧道隧洞施工地质技术.北京:中国铁道出版社,2001,101~152
    4周绪文.反射波地震勘探方法.北京:石油工业出版社,1981
    5朴化荣.电磁测深法原理EM3.北京:地质出版社,1990
    6牛之琏.时间域电磁法原理EM3.长沙:中南工业大学出版社,1993