高压、富水岩溶隧道施工地质预报探讨
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
在新大瑶山隧道工程中,建立了隧道施工地质预报机构和地质信息系统,采用了宏观控制预报、准确预报、验证预报三级预报方法。由于利用了以野外地质调绘、洞内CCD地质编录、超前水平钻探、TSP203及直流电法为主要探测手段的综合预报技术,提高了预报的科学性、准确性,降低了预报成本。
In the new Dayaoshan tunnel project,tunnel construction geological prediction agencies and geological information system were established which incorporated three-phase macro-control,accurate and validatation forecasting.In the process of construction a comprehensive geological prediction process was adopted including field geologic surveying and mapping,CCD geological logging,advance horizontal drilling,TSP 203,DC methods,which improved the forecasting accuracy and reduced the cost of prediction.
引文
[1]汪纲领,王国际,王公忠等.长大岩溶隧道水害综合治理技术研究[R].Wang Gangling,Wang Guoji,Wang Gongzhong,et al.Study on Comprehensive Treatment Technology of Water Hazards in Long-large Karst Tunnels[R].
    [2]王建秀,杨立中,何静.大型地下工程岩溶涌(突)水模式的水文地质分析及其工程应用[J].水文地质与工程地质,2001,(4):49~52Wang Jianxiu,Yang Lizhong,He Jing.The Hydro-geological Analysis of Karst Groundwater's Blow in Large-scale UndergroundEngineering[J].Hydrogeology and Engineering Geology,2001(4):49~52
    [3]柳宏达.岩溶隧道涌水防治技术[J].石家庄铁道学院学报,2002(6):60~62Liu Hongda.Prevention and Cure Technology for Water Infow into Karst Tunnel[J].Journal of Shijiazhuang Railway Institute,2002(6):60~62
    [4]俞文生,刘志刚.概论隧道超前地质预报技术体系[J].辽宁工程技术大学学报,2009,(6):379~381Yu Wensheng,Liu Zhigang.An Introduction to Technical System of Tunnel's Geological Forecast[J].Journal of Liaoning Technical University,2009,(6):379~381
    [5]王洪勇.综合超前地质预报在圆梁山隧道中的应用[J].现代隧道技术,2004,41(6):55~61Wang Hongyong.Comprehensive Advance Geology Prediction adopted in Yuanliangshan Tunnel[J].Modern Tunnelling Technology,2004,41(6):55~61
    [6]姜德义,李付胜,任松.高频地震反射法在大坪隧道施工中的应用[J].现代隧道技术,2007,44(12):77~81Jiang Deyi,Li Fusheng,Ren Song.Application of High-frequency Seismic Reflection Method in the Construction of Daping Tunnel[J].Modern Tunnelling Technology,2007,44(12):77~81
    [7]闫红江.牛岭界隧道施工综合地质预报技术[J].现代隧道技术,2005,42(10):60~65Yan Hongjiang.Comprehensive Geologic Prediction Techniques adopted in Niulingjie Tunnel Construction[J].Modern Tunnelling Technology,2005,42(10):60~65
    [8]张亚军.公路隧道施工地质工作的几点看法[J].现代隧道技术,2007,44(10):19~23Zhang Yajun.Comments on the Geology Work for Highway Tunnel Construction[J].Modern Tunnelling Technology,2007,44(10):19~23
    [9]张宗钢.拉之洞隧道溶洞涌泥处理施工技术[J].现代隧道技术,2006,43(12):56~59Zhang Zonggang.Techniques to Deal with the Mud-outburst in a Karst in Lazhidong Tunnel[J].Modern Tunnelling Technology,2006,43(12):56~59
    [10]袁勇.歌乐山隧道施工与环境保护[J].现代隧道技术,2004,41(2):68~72Yuan Yon.Construction and Environmental Protection of Geleshan Tunnel[J].Modern Tunnelling Technology,2004,41(2):68~72

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心