引文
[1]章在墉,冯时庆.地震危险性分析及其应用[M].上海:同济大学出版社,1996.
[2]Recommendations for Probabilistic Seismic Hazard Analysis:Guidance on Uncertainty and Use of Experts[R].Main Report,1997.
[3]胡聿贤,鹿林.地震活动性估计的不确定性[M]//地震危险性分析中的综合概率法.北京:地震出版社,1990:176-185.
[4]Geist E L,Parsons T.Probabilistic Analysis of Tsunami Hazards[J].Natural Hazards,2006,37(3):277-314.
[5]Stein S,Geller R J,Liu M.Why earthquake hazard maps often fail and what to do about it[J].Tectonophysics,2012,562-563:1-25.
[6]荆旭.地震危险性分析不确定性表征[J].核安全,2013(1):60-63.
[7]Intergovernmental Oceanographic Commission.Tsunami Glossary[M].Paris,UNESCO.IOC Technical Series,85,2008.
[8]任鲁川,洪明理.地震海啸危险性分析研究进展[J].防灾科技学院学报,2012,14(2):9-14.
[9]温瑞智,任叶飞,李小军,等.我国地震海啸危险性概率分析方法[J].华南地震,2012,31(4):1-13.
[10]Liu Y C,Santos A,Wang S M,et al.Tsunami hazards along Chinese coast from potential earthquakes in South China Sea[J].Physics of the Earth and Planetary Interiors,2007,163(1-4):233-244.
[11]Mansinha L,Smylie D E.The Displacement Fields of Inclined Faults[J].Bulletin of the Seismological Society of America,1971,61(5):1433-1440.
[12]Okada Y.Surface Deformation due to Shear and Tensile Faults in a Half-Space[J].Bulletin of the Seismological Society of America,1985,75(4):1135-1154.
[13]Goto C,Ogawa Y,Shuto N,et al.Numerical method of tsunami simulation with the leap frog scheme[Z].IUGG/IOC Time Project.IOC Manual,UNESCO 35.1997.
[14]Titov V V,Gonzalez F I.Implementation and testing of the Method of Splitting Tsunami(MOST)model[R].NOAA Technical Memorandum ERL PMEL-112,1997.
[15]Titov V,Synolakis C.Numerical modeling of tidal wave runup[J].Journal of Waterway,Port,Coastal,and Ocean Engineering,1998,124(4):151-171.
[16]Titov V V,Gonzalez F I,Bernard E N,et al.Real-time tsunami forecasting:challenges and solutions[J].Natural Hazards,2005,35(1):35-41.
[17]Liu P L-E,Woo S-B,Cho Y-S.Computer programs for tsunami propagation and inundation[EB/OL].Cornell University.1998.http://ceeserver.cee.cornell.Edu/pll-group/comcot-down.htm.
[18]Wang W M.User Manual for COMCOT Version 1.7[EB/OL],2009.http://ceeserver.cee.cornell.edu/pll-group/comcot.htm.
[19]于福江,叶琳,王喜年.1994年发生在台湾海峡的一次地震海啸的数值模拟[J].海洋学报,2001,23(6):32-39.
[20]胡聿贤.地震安全性评价技术教程[M].北京:地震出版社,1999.
[21]胡聿贤.地震危险性分析中的综合概率法[M].北京:地震出版社,1990.
[22]陈颙,陈棋福.印尼地震海啸及其相关的地球物理现象[J].地球物理学进展,2005,20(1):112-117.
[23]Kirby S,Geist E,Lee W H K,et al.Tsunami Source Characterization for Western Pacific Subduction Zones,A Preliminary Report[R].USGS Tsunami Subduction Source Working Group,2005.
[24]Satake K,Tanioka Y.Sources of tsunami and tsunamigenic earthquakes in subduction zones[M]//Seismogenic and Tsunamigenic Processes in Shallow Subduction Zones.Birkh?user Basel,1999:467-483.
[25]Lee W H K,Kirby S H,Diggles M F.compilers,2010,Program and abstracts of the Second Tsunami Source Workshop[EB/OL].2010.
[26]Kirby S H,Wartman J,Choy G L,et al.Large Off-trench Earthquakes and Their Tsunami Potentials[C]//Program and Abstracts of the Second Tsunami Source Workshop.U.S.Geological Survey Open-File Report 2010-1152,2010.
[27]蒋溥,戴丽思.工程地震学概论[M].北京:世界知识出版社,1993.
[28]Philip L,Liu F,Wang X M.Andrew John Salisbury.Tsunami Hazard and Forecast Study in South China Sea[EB/OL].http://ceeserver.cee.cornell.edu/pll-group/comcot.htm.
[29]陈运泰,杨智娴,许力生.海啸、地震海啸与海啸地震[J].物理,2005,34(12):864-872.
[30]Hanks T C,Kanamori H.A moment magnitude scale[J].Journal of Geophysical Research,1979,84(B5):2348-2350.
[31]Cornell C A.Engineering seismic risk analysis[J].Bulletin of the Seismological Society of America,1968,58(5):1583-1606.
[32]薛霆虓,邵志刚,傅容珊.特征地震现象和机制分析[J].地球物理学进展,2011,25(6):1887-1896.
[33]Paul Segall.Testing Earthquake Recurrence Models:Space-Time Patterns of Slip-Deficit at Parkfield[EB/OL].http://pangea.stanford.edu/research/CDFM/index.html.
[34]Rikitake T.Probability of a great earthquake to recur in the Tokai district,Japan:reevaluation based on newly-developed paleoseismology,plate tectonics,tsunami study,micro-seismicity and geodetic measurements[J].Earth,Planets and Space,1999,51(3):147-158.