四川剑阁县灾后农村建设规划研究
详细信息 本馆镜像全文    |  推荐本文 | | 获取馆网全文
摘要
立足于5·12汶川大地震后中国特色的灾后农村重建实态,针对灾后农村建设规划编制的特性认识、政策把握、民意调查、聚落发展、项目落实以及编制内容等六个方面的关键问题进行讨论,指出"过渡和长远"的冲突、"紧迫和秩序"的矛盾、"特殊和普遍"的对峙以及"公平与倾斜"的权衡是此类规划研究的关键,呼吁规划工作者对弱势群体人居环境发展的人文关怀.同时也简述了剑阁县灾后农村建设规划的主要成果.
Based on the actual situation of post-earthquake reconstruction in the rural areas in China after 5·12 earthquake disaster in Wenchuan,Sichuan Province,and from the aspects of understandings on particular characteristics,relative policy, public opinions survey,settlements development,projects implementation,and contents of the reconstruction planning,the article discussed six key issues and their causes this article pointed out that those are the keys to study such types of planning as the conflict between transition and long-lasting,the contradiction between pressing and order,the deadlock of universality and particularity and the weighing between equity and inclination.Humanistic care also appealed to the planners about the human habitat environment improvement of the inferior group.At last,it summarized the post-earthquake rural construction and planning for Jiange town.
引文
[1]剑阁县发展和改革局.剑阁县国民经济和社会发展“十一五”规划纲要[Z].四川:剑阁县,2005.Jiange County Development and Reform Bureau.Jiange Xian national economic and social development“11th Five-Year Plan”Program[Z].Sichuan:Jiange County,2005.
    [2]湖南省地质局.四川省5.12地震灾区广元市剑阁县地震灾害应急排查总结报告[R].长沙:湖南省地质局,2008.Hunan Provincial Geological Bureau.The Emergency Investigation Report for Jiange County,Guangyuan City,Si-chuan Province after 5.12 Earthquake Disaster[R].Changsha:Hunan Provincial Geological Bureau,2008.
    [3]中新网,民政部,国家发展改革委,等五部局.汶川地震灾害范围评估结果[R].2008-07-22.www.chinanews.com,Ministry of Civil Affairs,State Development and Reform Commission,et al.AssessmentReport of Earthquake Disaster Area in Wenchuan[R].2008-07-22.
    [4]第526号国务院令.汶川地震灾后恢复重建条例[S].2008.Order No.526 of the State Council.Ordinance for recovery and reconstruction of Wenchuan after the earthquakedisaster[S].2008.
    [5]抗震救灾总指挥部第十六次会议.国家汶川地震灾后重建规划工作方案[Z].2008.16th Session of Earthquake Relief work General Headquarters.Work Programfor Wenchuan Post-earth Recon-struction Planning[Z].2008.
    [6]剑阁县灾后农村建设规划编制组.剑阁县灾后重建城镇体系规划[Z].2008.Jiange Xian Government.The Urban System Planning in Jiange Town for Post-disaster Reconstruction[Z].2008.
    [7]农村建设规划工作组.四川省汶川地震灾后重建农村建设规划编制技术要求[Z].2008.Rural Construction Planning Working Group.Technical Requirements of The Post-earthquake Rural Constructionand Planning for Wenchuanin Sichuan Province[Z].2008.
    [8]张沛,李信仕,赵国锋.国外乡村发展经验对我国西部地区新农村建设的若干启示[J].西安建筑科技大学学报:社会科学版,2007,26(3):46-51.ZHANG Pei,LI Xin-shi,ZHAO Guo-feng.Enlightenments of Foreign Experiences for New Rural Constraetion inwestern China[J].J.Xi′an Univ.of Arch.&Tech.(Social Scienec Edition),2007,26(3):46-51.

版权所有:© 2023 中国地质图书馆 中国地质调查局地学文献中心